Burn-In Testing System of Wind Power Converter
碩士 === 國立成功大學 === 電機工程學系碩博士班 === 98 === The “Burn-In Testing System of Wind Power Converter” is proposed in this thesis. The system function is to simulate the permanent magnet synchronous generator and provide wind power converter to proceed burn-in test. The system is composed of two stage. The fr...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/92876501948206158484 |
id |
ndltd-TW-098NCKU5442207 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-098NCKU54422072016-04-22T04:22:57Z http://ndltd.ncl.edu.tw/handle/92876501948206158484 Burn-In Testing System of Wind Power Converter 風力發電轉換器之燒機測試系統 Chen-ChiehKao 高振傑 碩士 國立成功大學 電機工程學系碩博士班 98 The “Burn-In Testing System of Wind Power Converter” is proposed in this thesis. The system function is to simulate the permanent magnet synchronous generator and provide wind power converter to proceed burn-in test. The system is composed of two stage. The front-stage is a single-phase full-bridge rectifier with voltage step-up function and power factor correction. The rear-stage is a three-phase full-bridge inverter used to regulate the output voltage and frequency. Digital signal processor is used as control kernel to simplify the practical circuit and speed up implementing process. Finally, a prototype of burn-in testing system with 110V input and 38-120V/40-120Hz output is implemented to verify the feasibility. Jiann-Fuh Chen 陳建富 2010 學位論文 ; thesis 62 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立成功大學 === 電機工程學系碩博士班 === 98 === The “Burn-In Testing System of Wind Power Converter” is proposed in this thesis. The system function is to simulate the permanent magnet synchronous generator and provide wind power converter to proceed burn-in test. The system is composed of two stage. The front-stage is a single-phase full-bridge rectifier with voltage step-up function and power factor correction. The rear-stage is a three-phase full-bridge inverter used to regulate the output voltage and frequency. Digital signal processor is used as control kernel to simplify the practical circuit and speed up implementing process. Finally, a prototype of burn-in testing system with 110V input and 38-120V/40-120Hz output is implemented to verify the feasibility.
|
author2 |
Jiann-Fuh Chen |
author_facet |
Jiann-Fuh Chen Chen-ChiehKao 高振傑 |
author |
Chen-ChiehKao 高振傑 |
spellingShingle |
Chen-ChiehKao 高振傑 Burn-In Testing System of Wind Power Converter |
author_sort |
Chen-ChiehKao |
title |
Burn-In Testing System of Wind Power Converter |
title_short |
Burn-In Testing System of Wind Power Converter |
title_full |
Burn-In Testing System of Wind Power Converter |
title_fullStr |
Burn-In Testing System of Wind Power Converter |
title_full_unstemmed |
Burn-In Testing System of Wind Power Converter |
title_sort |
burn-in testing system of wind power converter |
publishDate |
2010 |
url |
http://ndltd.ncl.edu.tw/handle/92876501948206158484 |
work_keys_str_mv |
AT chenchiehkao burnintestingsystemofwindpowerconverter AT gāozhènjié burnintestingsystemofwindpowerconverter AT chenchiehkao fēnglìfādiànzhuǎnhuànqìzhīshāojīcèshìxìtǒng AT gāozhènjié fēnglìfādiànzhuǎnhuànqìzhīshāojīcèshìxìtǒng |
_version_ |
1718229836544081920 |