Burn-In Testing System of Wind Power Converter

碩士 === 國立成功大學 === 電機工程學系碩博士班 === 98 === The “Burn-In Testing System of Wind Power Converter” is proposed in this thesis. The system function is to simulate the permanent magnet synchronous generator and provide wind power converter to proceed burn-in test. The system is composed of two stage. The fr...

Full description

Bibliographic Details
Main Authors: Chen-ChiehKao, 高振傑
Other Authors: Jiann-Fuh Chen
Format: Others
Language:zh-TW
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/92876501948206158484
id ndltd-TW-098NCKU5442207
record_format oai_dc
spelling ndltd-TW-098NCKU54422072016-04-22T04:22:57Z http://ndltd.ncl.edu.tw/handle/92876501948206158484 Burn-In Testing System of Wind Power Converter 風力發電轉換器之燒機測試系統 Chen-ChiehKao 高振傑 碩士 國立成功大學 電機工程學系碩博士班 98 The “Burn-In Testing System of Wind Power Converter” is proposed in this thesis. The system function is to simulate the permanent magnet synchronous generator and provide wind power converter to proceed burn-in test. The system is composed of two stage. The front-stage is a single-phase full-bridge rectifier with voltage step-up function and power factor correction. The rear-stage is a three-phase full-bridge inverter used to regulate the output voltage and frequency. Digital signal processor is used as control kernel to simplify the practical circuit and speed up implementing process. Finally, a prototype of burn-in testing system with 110V input and 38-120V/40-120Hz output is implemented to verify the feasibility. Jiann-Fuh Chen 陳建富 2010 學位論文 ; thesis 62 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 電機工程學系碩博士班 === 98 === The “Burn-In Testing System of Wind Power Converter” is proposed in this thesis. The system function is to simulate the permanent magnet synchronous generator and provide wind power converter to proceed burn-in test. The system is composed of two stage. The front-stage is a single-phase full-bridge rectifier with voltage step-up function and power factor correction. The rear-stage is a three-phase full-bridge inverter used to regulate the output voltage and frequency. Digital signal processor is used as control kernel to simplify the practical circuit and speed up implementing process. Finally, a prototype of burn-in testing system with 110V input and 38-120V/40-120Hz output is implemented to verify the feasibility.
author2 Jiann-Fuh Chen
author_facet Jiann-Fuh Chen
Chen-ChiehKao
高振傑
author Chen-ChiehKao
高振傑
spellingShingle Chen-ChiehKao
高振傑
Burn-In Testing System of Wind Power Converter
author_sort Chen-ChiehKao
title Burn-In Testing System of Wind Power Converter
title_short Burn-In Testing System of Wind Power Converter
title_full Burn-In Testing System of Wind Power Converter
title_fullStr Burn-In Testing System of Wind Power Converter
title_full_unstemmed Burn-In Testing System of Wind Power Converter
title_sort burn-in testing system of wind power converter
publishDate 2010
url http://ndltd.ncl.edu.tw/handle/92876501948206158484
work_keys_str_mv AT chenchiehkao burnintestingsystemofwindpowerconverter
AT gāozhènjié burnintestingsystemofwindpowerconverter
AT chenchiehkao fēnglìfādiànzhuǎnhuànqìzhīshāojīcèshìxìtǒng
AT gāozhènjié fēnglìfādiànzhuǎnhuànqìzhīshāojīcèshìxìtǒng
_version_ 1718229836544081920