Estimating Productivity of Highway Construction Tasks based on Fuzzy Theory
碩士 === 國立成功大學 === 土木工程學系碩博士班 === 98 === Estimation of the construction period is base on each construction activities length time. Generally, the estimation is compute in working productivity or working rate. It is very important that might affect the accuracy in determine construction operation dur...
Main Authors: | Zi-YuenShen, 沈子淵 |
---|---|
Other Authors: | Nang-Fei Pan |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/70606471288611736734 |
Similar Items
-
Highway bridge construction production rates for time estimation
by: Huh, Youngki, 1969-
Published: (2011) -
Highway earthwork and pavement production rates for construction time estimation
by: Kuo, Yao-chen
Published: (2008) -
Survey of productivity rates used for highway construction.
by: Harber, Michael A.
Published: (2014) -
Risk Evaluation Model of Highway Tunnel Portal Construction Based on BP Fuzzy Neural Network
by: Xianghui Deng, et al.
Published: (2018-01-01) -
Safety Early Warning Research for Highway Construction Based on Case-Based Reasoning and Variable Fuzzy Sets
by: Yan Liu, et al.
Published: (2013-01-01)