Linking Engineers’ Scheduling Capabilities with Schedule Usage
碩士 === 國立成功大學 === 土木工程學系碩博士班 === 98 === Schedule related problems are very common for construction projects. Possible reasons include ignorance of planning, not-well-prepared schedules, lack of scheduling experience, etc. On the other hand, various schedule analysis methods have been developed in th...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/39322549655063103578 |