Man-day Based Network Engineering Proiect Scheduling Optimization Study Using Particle Swarm Optimization Scheme
碩士 === 國立勤益科技大學 === 電子工程系 === 98 === For the smooth implementation of the network constructions project and maximize profits, a well estimated project schedule (construction project scheduling) is important. Good or bad scheduling will seriously affect the cost paid and profits earned; therefore...
Main Authors: | Houng-Chang Tsai, 蔡鴻章 |
---|---|
Other Authors: | Dr. Ruey-Maw Chen |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/57621368607932198410 |
Similar Items
-
An Efficient Particle Swarm Optimizer with Application to Man-Day Project Scheduling Problems
by: Ruey-Maw Chen, et al.
Published: (2014-01-01) -
Particle Swarm Optimization for Solving Scheduling Problems
by: Chao-Tang Tseng, et al.
Published: (2006) -
The Application of Particle Swarm Optimization with Performance Indicators to the Scheduling Optimization
by: Jun-Nan Chen, et al.
Published: (2015) -
Optimization of Day-Ahead Energy Storage System Scheduling in Microgrid Using Genetic Algorithm and Particle Swarm Optimization
by: Ajay Raghavan, et al.
Published: (2020-01-01) -
Particle swarm optimization and opposite-based particle swarm optimizations for scheduling two-agent customer order problem
by: 吳佳翰
Published: (2016)