Study on Minimizing Costs in the Construction Engineering using site-thinking model

碩士 === 明新科技大學 === 營建工程與管理研究所 === 99 === “Construction cost” is that every investor wants to minimize; on the other hand, every investor wants to maximize “net profit”. Hence, it is valuable to study how to achieve “minimum construction cost and maximum net profit”. Many studies focus on reducing the...

Full description

Bibliographic Details
Main Author: 劉彦宏
Other Authors: 陳鴻輝
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/94012783560474190629
id ndltd-TW-098MHIT5512043
record_format oai_dc
spelling ndltd-TW-098MHIT55120432015-10-14T04:06:59Z http://ndltd.ncl.edu.tw/handle/94012783560474190629 Study on Minimizing Costs in the Construction Engineering using site-thinking model 營建業以工地思維模式降低成本之研究 劉彦宏 碩士 明新科技大學 營建工程與管理研究所 99 “Construction cost” is that every investor wants to minimize; on the other hand, every investor wants to maximize “net profit”. Hence, it is valuable to study how to achieve “minimum construction cost and maximum net profit”. Many studies focus on reducing the cost but their approach and analysis are not on the base of real practice on the construction site. This research aims to employing site experience of the researcher and the survey of expert’s interview to understand the effective factors in reducing the cost to a reasonable level. The questionnaire includes the following information: A. The management of the construction company; B. The control of the volatile basic-unit labor; C. Cost of execution. This study uses Analytic Hierarchy Process (AHP) tool as the method to analyze the collected thirteen cases. It shows that the effective factors in reducing the cost. The results are arranged in the order of effectiveness: 1. The establishment of prompt and the effective reward system; 2. The separation of power of the company and the work-site purchase from the human resource office, but under a centralized control; 3. Cautious selection of contractors, who can grow with the company; 4. An authoritative budget system; 5. The control of personnel in an effective scale to reduce labor cost; 6. The collaboration among the departments of construction, purchase, and sales; 7. The improvement of working conditions and work morale to encourage effective work; 8. The establishment of strategic alliance under the principles of the scale of the cases; 9. Within a reasonable scope, the reduction of work schedule to reduce the management cost; 10. The training of laborers in technical work to achieve the goal of the division of labor. The first effective factor, “the establishment of prompt and the effective reward system” shows 0.4618 in AHP. The second in line, showing 0.3370 in AHP, is “the separation of power of the company and the work-site purchase from the human resource office, but under a centralized control”. 陳鴻輝 2011 學位論文 ; thesis 74 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 明新科技大學 === 營建工程與管理研究所 === 99 === “Construction cost” is that every investor wants to minimize; on the other hand, every investor wants to maximize “net profit”. Hence, it is valuable to study how to achieve “minimum construction cost and maximum net profit”. Many studies focus on reducing the cost but their approach and analysis are not on the base of real practice on the construction site. This research aims to employing site experience of the researcher and the survey of expert’s interview to understand the effective factors in reducing the cost to a reasonable level. The questionnaire includes the following information: A. The management of the construction company; B. The control of the volatile basic-unit labor; C. Cost of execution. This study uses Analytic Hierarchy Process (AHP) tool as the method to analyze the collected thirteen cases. It shows that the effective factors in reducing the cost. The results are arranged in the order of effectiveness: 1. The establishment of prompt and the effective reward system; 2. The separation of power of the company and the work-site purchase from the human resource office, but under a centralized control; 3. Cautious selection of contractors, who can grow with the company; 4. An authoritative budget system; 5. The control of personnel in an effective scale to reduce labor cost; 6. The collaboration among the departments of construction, purchase, and sales; 7. The improvement of working conditions and work morale to encourage effective work; 8. The establishment of strategic alliance under the principles of the scale of the cases; 9. Within a reasonable scope, the reduction of work schedule to reduce the management cost; 10. The training of laborers in technical work to achieve the goal of the division of labor. The first effective factor, “the establishment of prompt and the effective reward system” shows 0.4618 in AHP. The second in line, showing 0.3370 in AHP, is “the separation of power of the company and the work-site purchase from the human resource office, but under a centralized control”.
author2 陳鴻輝
author_facet 陳鴻輝
劉彦宏
author 劉彦宏
spellingShingle 劉彦宏
Study on Minimizing Costs in the Construction Engineering using site-thinking model
author_sort 劉彦宏
title Study on Minimizing Costs in the Construction Engineering using site-thinking model
title_short Study on Minimizing Costs in the Construction Engineering using site-thinking model
title_full Study on Minimizing Costs in the Construction Engineering using site-thinking model
title_fullStr Study on Minimizing Costs in the Construction Engineering using site-thinking model
title_full_unstemmed Study on Minimizing Costs in the Construction Engineering using site-thinking model
title_sort study on minimizing costs in the construction engineering using site-thinking model
publishDate 2011
url http://ndltd.ncl.edu.tw/handle/94012783560474190629
work_keys_str_mv AT liúyànhóng studyonminimizingcostsintheconstructionengineeringusingsitethinkingmodel
AT liúyànhóng yíngjiànyèyǐgōngdesīwéimóshìjiàngdīchéngběnzhīyánjiū
_version_ 1718089841647812608