Power Planning for a Time-of-Use Rate User
碩士 === 明新科技大學 === 電機工程研究所 === 98 === Both customers and electric utility companies have experienced increasing costs in energy and electric power due to the escalating cost of burning fuels and capital costs for building new generation units. The time-of-use (TOU) rate and load reduction programs (L...
Main Authors: | Tian-Peng Zhu, 朱天鵬 |
---|---|
Other Authors: | Tsung-Ying Lee |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/63850293086166544089 |
Similar Items
-
Study on power system economic dispatch optimization of electric vehicle aggregates and time-of-use rate users
by: Tsai, Cheng-Ta, et al.
Published: (2018) -
Power System Passive Harmonic Filter Planning and Development of Matlab-Based Graphical User Interface
by: S. Y. Chu, et al.
Published: (2002) -
Study of Grid-Connected Photovoltaic Power Supply Systems
by: Ting-peng Lee, et al.
Published: (2010) -
A DC Power System Fed by Utility and a Photovoltaic System Parallel-Connected at DC Side
by: Ting-Peng Lee, et al.
Published: (2007) -
Selection of Wind Turbine Generator For a Time-Of-Use Rate User
by: Chao-Yang Fan-Jiang, et al.
Published: (2007)