The Comparison of Time Extension Activities Claimed for General Condition between Taiwan and FIDIC
碩士 === 中原大學 === 財經法律研究所 === 98 === Extension of time, either in local or international projects, is always the thorniest problem to deal with in construction disputes. After Taiwan joins Government Procurement Agreement, the local engineers and law staffs have been facing a critical issue—How to enh...
Main Authors: | Tien-Sheng Chou, 周天昇 |
---|---|
Other Authors: | INGE YIN-CHIN CHEN |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/30104423272416919557 |
Similar Items
-
The Difference of Claim Request Right for General Condition between Public Construction in Taiwan and FIDIC
by: Chih-Cheng Lin, et al.
Published: (2008) -
Comparison between FIDIC Contract Model with Taiwan Construction Specifications
by: Chih-Hung Huang, et al.
Published: (2009) -
A Study on Comparison of Dispute Claim between FIDIC International Design-Build Contracts and Domestic Design-Build Contracts
by: Sheng-Huei Wu, et al.
Published: (2010) -
A Comparison With FIDIC Contract and Public Construction Contract In Taiwan-Focusing on The Warranty Conditions of Works
by: Yu-Ming Liang, et al.
Published: (2017) -
Contract Administration Practice Derived From The Relevance Between FIDIC General Conditions And Civil Law
by: Shih-Shou Kuo, et al.
Published: (2005)