Study On Hot Spring Water Resource Management System with 3S Technology for Construction and Application – A case Study of Guanzihling area in Tainan County

碩士 === 嘉南藥理科技大學 === 休閒與空間資訊研究所 === 98 === For natural preservation and sustainable utilization, the future hot spring users are requested to stipulate payment according to the Article 11 of Hot Spring Act. The competent authority should impose the hot spring undertakings or individuals for the use f...

Full description

Bibliographic Details
Main Authors: Kuan-Hua Chen, 陳冠樺
Other Authors: Kuan-Wen Chen
Format: Others
Language:zh-TW
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/47054235402397948375
id ndltd-TW-098CNUP5675005
record_format oai_dc
spelling ndltd-TW-098CNUP56750052015-10-13T19:06:45Z http://ndltd.ncl.edu.tw/handle/47054235402397948375 Study On Hot Spring Water Resource Management System with 3S Technology for Construction and Application – A case Study of Guanzihling area in Tainan County 應用3S技術進行溫泉區取供事業營運管理系統建置之初探--以台南縣關子嶺溫泉區為例 Kuan-Hua Chen 陳冠樺 碩士 嘉南藥理科技大學 休閒與空間資訊研究所 98 For natural preservation and sustainable utilization, the future hot spring users are requested to stipulate payment according to the Article 11 of Hot Spring Act. The competent authority should impose the hot spring undertakings or individuals for the use fee. Besides for administrative expenses, the tax revenues are specifically for the uses of resource preservation, management, international exchange, and public facilities. While all the industry runners still keep a wait-and-see attitude at present. Although the Act has been promulgated and enforced so far for nearly 8 years, only few manufacturers have applied for the Economic Department Water Right Form in accordance with the law. Due to the large quantities of underground well without obtaining right form of legal water, the ideal of implementation of user-pays in hot spring area seems not within a foreseeable future. According to the applying procedures, the undertakings are requested to obtain not only commercial registration but land and water right. The runners are not permitted to carry on any hot spring area development until all the legal application has been finished. For this reason, a set of rigorous and scientific management system is essential for the undertakings. Otherwise, any unfair treatment to the lodging industry of hot spring area may be produced; for instance, the industry runners may have different standard on water quality and water yield. This research adopts 3S technology. Firstly, we search for the hot spring position by using satellite (GPS). Next, we carry on visual appearance to dispose the space of pipeline and user (RS). Then, we establish the well of hot spring and control information of water quality and water yield with, combining the geographical materials with geographic characteristics(GIS). The pioneering study is set in Guanzihling Hot Spring Area.As the demonstration area, The Guanzihling Hot Spring Area follows the norm of " Covenient To Share Rsources " in The Hot Spring Act and sets up a fair, effective, and exact system for hot spring industry. The administrative system is expected to play a consultant role in the government management. Trough combination of the pictures and system function, the study will also be an important system in regional development plan and of administrative decision. Kuan-Wen Chen 陳冠位 2010 學位論文 ; thesis 96 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 嘉南藥理科技大學 === 休閒與空間資訊研究所 === 98 === For natural preservation and sustainable utilization, the future hot spring users are requested to stipulate payment according to the Article 11 of Hot Spring Act. The competent authority should impose the hot spring undertakings or individuals for the use fee. Besides for administrative expenses, the tax revenues are specifically for the uses of resource preservation, management, international exchange, and public facilities. While all the industry runners still keep a wait-and-see attitude at present. Although the Act has been promulgated and enforced so far for nearly 8 years, only few manufacturers have applied for the Economic Department Water Right Form in accordance with the law. Due to the large quantities of underground well without obtaining right form of legal water, the ideal of implementation of user-pays in hot spring area seems not within a foreseeable future. According to the applying procedures, the undertakings are requested to obtain not only commercial registration but land and water right. The runners are not permitted to carry on any hot spring area development until all the legal application has been finished. For this reason, a set of rigorous and scientific management system is essential for the undertakings. Otherwise, any unfair treatment to the lodging industry of hot spring area may be produced; for instance, the industry runners may have different standard on water quality and water yield. This research adopts 3S technology. Firstly, we search for the hot spring position by using satellite (GPS). Next, we carry on visual appearance to dispose the space of pipeline and user (RS). Then, we establish the well of hot spring and control information of water quality and water yield with, combining the geographical materials with geographic characteristics(GIS). The pioneering study is set in Guanzihling Hot Spring Area.As the demonstration area, The Guanzihling Hot Spring Area follows the norm of " Covenient To Share Rsources " in The Hot Spring Act and sets up a fair, effective, and exact system for hot spring industry. The administrative system is expected to play a consultant role in the government management. Trough combination of the pictures and system function, the study will also be an important system in regional development plan and of administrative decision.
author2 Kuan-Wen Chen
author_facet Kuan-Wen Chen
Kuan-Hua Chen
陳冠樺
author Kuan-Hua Chen
陳冠樺
spellingShingle Kuan-Hua Chen
陳冠樺
Study On Hot Spring Water Resource Management System with 3S Technology for Construction and Application – A case Study of Guanzihling area in Tainan County
author_sort Kuan-Hua Chen
title Study On Hot Spring Water Resource Management System with 3S Technology for Construction and Application – A case Study of Guanzihling area in Tainan County
title_short Study On Hot Spring Water Resource Management System with 3S Technology for Construction and Application – A case Study of Guanzihling area in Tainan County
title_full Study On Hot Spring Water Resource Management System with 3S Technology for Construction and Application – A case Study of Guanzihling area in Tainan County
title_fullStr Study On Hot Spring Water Resource Management System with 3S Technology for Construction and Application – A case Study of Guanzihling area in Tainan County
title_full_unstemmed Study On Hot Spring Water Resource Management System with 3S Technology for Construction and Application – A case Study of Guanzihling area in Tainan County
title_sort study on hot spring water resource management system with 3s technology for construction and application – a case study of guanzihling area in tainan county
publishDate 2010
url http://ndltd.ncl.edu.tw/handle/47054235402397948375
work_keys_str_mv AT kuanhuachen studyonhotspringwaterresourcemanagementsystemwith3stechnologyforconstructionandapplicationacasestudyofguanzihlingareaintainancounty
AT chénguānhuà studyonhotspringwaterresourcemanagementsystemwith3stechnologyforconstructionandapplicationacasestudyofguanzihlingareaintainancounty
AT kuanhuachen yīngyòng3sjìshùjìnxíngwēnquánqūqǔgōngshìyèyíngyùnguǎnlǐxìtǒngjiànzhìzhīchūtànyǐtáinánxiànguānzilǐngwēnquánqūwèilì
AT chénguānhuà yīngyòng3sjìshùjìnxíngwēnquánqūqǔgōngshìyèyíngyùnguǎnlǐxìtǒngjiànzhìzhīchūtànyǐtáinánxiànguānzilǐngwēnquánqūwèilì
_version_ 1718040140855640064