The study on ways to improve the implementation of government contracts after the acceptance of price reduction basing on the Government Procurement Act
碩士 === 中華大學 === 營建管理學系碩士班 === 98 === Under the current work inspection and acceptance procedures, when construction contractors have completed their construction work, government agencies on the procuring side need to perform inspection before acceptance. If there are defects in the contracted work,...
Main Authors: | PENG,KANG-HUNG, 彭康泓 |
---|---|
Other Authors: | Ming-Teh Wang |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/37663586719955885294 |
Similar Items
-
The study of the acceptance with price-reduction of the government procurement act
by: Hsu, Tseng-Ju, et al.
Published: (2009) -
A Legal-Policy analysis of the acceptance with price-reduction on the Government Procurement Act
by: Pin-Yi Wu, et al.
Published: (2015) -
Contracting out in local environmental protection agencies after the implementation of Government Procurement Act
by: Lin yi-cheng, et al.
Published: (2010) -
A Study on the Contract Awarding Procedure of Government Procurement Act
by: Yi-Fen Kung, et al.
Published: (2018) -
A Study on Contract Awarding Issues of the Government Procurement Act
by: Huang, Ruo-Ching, et al.
Published: (2016)