Uniform Parallel-Machine Scheduling Problems with Downward Compatible Machines — a Case Study of A Company
碩士 === 元智大學 === 工業工程與管理學系 === 97 === In the lead frame packaging process of semiconductor manufacturing, wire bond process is the bottleneck operation. Firms constantly seek for new wire bond machines with better functionality and higher efficiency. As a result, a wire bond work center usually conta...
Main Authors: | Peng-Yuan Wei, 魏鵬原 |
---|---|
Other Authors: | Chi-Yange Tsai |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/11212568361185828844 |
Similar Items
-
Uniform Parallel-Machine Scheduling Problems with Constrained Resources
by: Yi-Chen Wang, et al.
Published: (2008) -
Applying Heuristic Algorithms for Solving Uniform Parallel Machine Scheduling Problems
by: Chuang, Mei-Chi, et al.
Published: (2014) -
Uniform parallel machines scheduling with a truncation learning effect
by: Wei-siang Jhuang, et al.
Published: (2012) -
Scheduling equal-length jobs on uniform parallel machines
by: Guan-jhong Lin, et al.
Published: (2010) -
Uniform parallel-machine scheduling problems with large machines — a case study of ic packaging's bottleneck station
by: 陳韋嘉