Probability for Project Complete with Multiplex Critical Path
碩士 === 國立臺北科技大學 === 商業自動化與管理研究所 === 97 === Projects are often quite complex with a lot of uncertainties on both project activity time and project completion time. Project activity time can be viewed as a random variable whereby the project completion also becomes a random variable. For a project man...
Main Authors: | Kuan-Kuan Chang, 張寬寬 |
---|---|
Other Authors: | Edward Yu-Hsien Lin |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/s72kvk |
Similar Items
-
A study of Principals’Curriculum Leadership in Taipei Elementary Schools
by: Kuan Kuan Lain, et al.
Published: (2005) -
A Study on the Project Management Model with Probability of Completion:Based on Earned Value Management and Critical Chain
by: Wu, Guo-Heng, et al.
Published: (2018) -
Establishing the Expected Profit Model of the Crashing Project with Project Completion Probability and PSO Method
by: Yu-Chiun Chen, et al.
Published: (2008) -
Shortest Paths in Multiplex Networks
by: Saeed Ghariblou, et al.
Published: (2017-05-01) -
The Relevance of Measure and Probability, and Definition of Completeness of Probability
by: Zhang Bo, et al.
Published: (2006-01-01)