Case study of shield disassembly in grouted soils outside the diaphragm wall of the arrival shaft
碩士 === 國立臺北科技大學 === 土木與防災研究所 === 97 === It is very difficult to deal with the tunnel-shaft interface problem between different construction lots especially for metro system, which involves several factors such as differences in construction schedule and its scale. Besides, for shield tunnelling, con...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/75dmj8 |