Dynamic Schedule Optimization for Ready Mixed Concrete Assignment Using Radio Frequency Identification
碩士 === 國立臺灣科技大學 === 營建工程系 === 97 === Ready mixed concrete(RMC)is a kind of famous material in construction engineering from 20 centuries. In general, RMC assignment schedule is controlled by schedule controller’ experience. But, proceeding assignment schedule work by someone’s subjective comment is...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/11401533334156311714 |