Scheduling Project Tasks under Resource Constrained using Design Structure Matrix and Quality Equations
碩士 === 國立臺灣科技大學 === 營建工程系 === 97 === Design phase is characterized by highly coupled and interdependent activities, which result rework or iteration in this phase. In dealing with this problem, information flows have to be well organized, so it can lead to the most optimum completion time. The Depen...
Main Authors: | Theresia Daisy Nattali Suparman, 陳戴幸 |
---|---|
Other Authors: | Sou Sen Leu |
Format: | Others |
Language: | en_US |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/06369888115901612781 |
Similar Items
-
An Exploratory Study on Optimal Iterative Design Schedules with the Consideration of Design Quality and Resource Constraints
by: Sou-Sen Leu, et al.
Published: (2021-04-01) -
Resource constrained step scheduling of project tasks
by: Eygelaar, Anton Burger
Published: (2010) -
Multi-mode resource-constrained project scheduling problem with resource vacations and task splitting
by: Buddhakulsomsiri, Jirachai
Published: (2012) -
Multiobjective Resource-Constrained Project Scheduling with a Time-Varying Number of Tasks
by: Manuel Blanco Abello, et al.
Published: (2014-01-01) -
Resource Constrained Project Scheduling with Stochastic Resources
by: Furkan Uysal, et al.
Published: (2018-03-01)