Applying Object-Block-Based Visualization to Construction Site Management -A Precast Concrete Case in High-Tech Plant Construction
碩士 === 國立臺灣大學 === 土木工程學研究所 === 97 === The features of High-tech factory construction project include tight construction duration, numerous mobilization, high-volume of materials, and complexity of interfaces. In the overall project, the cost and the progress of construction are seriously affected by...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/74109051526575093600 |
id |
ndltd-TW-097NTU05015070 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-097NTU050150702016-05-04T04:31:32Z http://ndltd.ncl.edu.tw/handle/74109051526575093600 Applying Object-Block-Based Visualization
to Construction Site Management
-A Precast Concrete Case in High-Tech Plant Construction 應用圖型物件於施工管理之探討
-以高科技廠房預鑄工法為例 Ssu-Hsien Sung 宋思賢 碩士 國立臺灣大學 土木工程學研究所 97 The features of High-tech factory construction project include tight construction duration, numerous mobilization, high-volume of materials, and complexity of interfaces. In the overall project, the cost and the progress of construction are seriously affected by transmission of interface information. According to Lean Construction Institute theory, due to inefficiency, errors, delay, and communications, 30% of the construction cost are wasted on manpower and material. Therefore, in order to reduce waste and risk in project planning and construction , this research intends to use 4D visualized model to facilitate the transmission interface of information. The purpose of this research aims to apply 4D visualized technology for facilitating construction site management and in line with the theory of Lean Construction concepts. The research project focuses on construction management, and its research process is as follows: the first step is to establish a Work Breakdwon Structure (WBS) based on 4D image, known as Object Block Work Breakdown Structure (OBWBS), which is advantageous to define images in the working items operated by the contractor of the project. The second step is to plan the construction process of contractors. Finally the images classified by OBWBS are linked to construction project process and carried out 4D simulation. Consequently, this 4D visualized model can be applied to simulate working process for various contrators work. Meanwhile, it can be used to verify how far is between the current stage and the ultimate result. The model can surely improve communication and efficiency of decision making. 張陸滿 2009 學位論文 ; thesis 88 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺灣大學 === 土木工程學研究所 === 97 === The features of High-tech factory construction project include tight construction duration, numerous mobilization, high-volume of materials, and complexity of interfaces. In the overall project, the cost and the progress of construction are seriously affected by transmission of interface information.
According to Lean Construction Institute theory, due to inefficiency, errors, delay, and communications, 30% of the construction cost are wasted on manpower and material. Therefore, in order to reduce waste and risk in project planning and construction , this research intends to use 4D visualized model to facilitate the transmission interface of information.
The purpose of this research aims to apply 4D visualized technology for facilitating construction site management and in line with the theory of Lean Construction concepts. The research project focuses on construction management, and its research process is as follows: the first step is to establish a Work Breakdwon Structure (WBS) based on 4D image, known as Object Block Work Breakdown Structure (OBWBS), which is advantageous to define images in the working items operated by the contractor of the project. The second step is to plan the construction process of contractors. Finally the images classified by OBWBS are linked to construction project process and carried out 4D simulation.
Consequently, this 4D visualized model can be applied to simulate working process for various contrators work. Meanwhile, it can be used to verify how far is between the current stage and the ultimate result. The model can surely improve communication and efficiency of decision making.
|
author2 |
張陸滿 |
author_facet |
張陸滿 Ssu-Hsien Sung 宋思賢 |
author |
Ssu-Hsien Sung 宋思賢 |
spellingShingle |
Ssu-Hsien Sung 宋思賢 Applying Object-Block-Based Visualization to Construction Site Management -A Precast Concrete Case in High-Tech Plant Construction |
author_sort |
Ssu-Hsien Sung |
title |
Applying Object-Block-Based Visualization
to Construction Site Management
-A Precast Concrete Case in High-Tech Plant Construction |
title_short |
Applying Object-Block-Based Visualization
to Construction Site Management
-A Precast Concrete Case in High-Tech Plant Construction |
title_full |
Applying Object-Block-Based Visualization
to Construction Site Management
-A Precast Concrete Case in High-Tech Plant Construction |
title_fullStr |
Applying Object-Block-Based Visualization
to Construction Site Management
-A Precast Concrete Case in High-Tech Plant Construction |
title_full_unstemmed |
Applying Object-Block-Based Visualization
to Construction Site Management
-A Precast Concrete Case in High-Tech Plant Construction |
title_sort |
applying object-block-based visualization
to construction site management
-a precast concrete case in high-tech plant construction |
publishDate |
2009 |
url |
http://ndltd.ncl.edu.tw/handle/74109051526575093600 |
work_keys_str_mv |
AT ssuhsiensung applyingobjectblockbasedvisualizationtoconstructionsitemanagementaprecastconcretecaseinhightechplantconstruction AT sòngsīxián applyingobjectblockbasedvisualizationtoconstructionsitemanagementaprecastconcretecaseinhightechplantconstruction AT ssuhsiensung yīngyòngtúxíngwùjiànyúshīgōngguǎnlǐzhītàntǎoyǐgāokējìchǎngfángyùzhùgōngfǎwèilì AT sòngsīxián yīngyòngtúxíngwùjiànyúshīgōngguǎnlǐzhītàntǎoyǐgāokējìchǎngfángyùzhùgōngfǎwèilì |
_version_ |
1718259205288230912 |