Application of Real Options Analysis to Pond Capacity Expansion Schedule Decision Problems
碩士 === 國立臺灣大學 === 土木工程學研究所 === 97 === In hydraulic engineering, there are 3 sub problem in capacity expansion problem, i.e. location, sizing, and scheduling. In the past, the former problems are well known. However, the third problem is searched in a lot of ways of thinking. This research uses the c...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/07488229253191935259 |
id |
ndltd-TW-097NTU05015061 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-097NTU050150612016-05-04T04:31:32Z http://ndltd.ncl.edu.tw/handle/07488229253191935259 Application of Real Options Analysis to Pond Capacity Expansion Schedule Decision Problems 應用實質選擇權決定埤塘擴充時程之研究 Hsin-Ru Wang 王鑫儒 碩士 國立臺灣大學 土木工程學研究所 97 In hydraulic engineering, there are 3 sub problem in capacity expansion problem, i.e. location, sizing, and scheduling. In the past, the former problems are well known. However, the third problem is searched in a lot of ways of thinking. This research uses the concept of real option method and uncertainty analysis method to develop a numerical model and to simulate the influence of pond expansion scheduling on the benefit. The model includes generation of future rain data, ponds supplying water, and real option analysis. And in the problem of expansion location and expansion sizing, this research uses traditional optimization to solve the problem. This research uses optimization model to solve the problem of location and sizing. The result shows that the benefit is significant. And using the real data to optimization model, one can get the optimal benefit will be almost 60 million, but execute capacity in some condition will have no benefit. Through the real option model one can know that early execute capacity expansion will have more benefit. By adding the 2 model we can analyze capacity expansion problem efficiently. Nien-Sheng Hsu 徐年盛 2009 學位論文 ; thesis 97 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺灣大學 === 土木工程學研究所 === 97 === In hydraulic engineering, there are 3 sub problem in capacity expansion problem, i.e. location, sizing, and scheduling. In the past, the former problems are well known. However, the third problem is searched in a lot of ways of thinking. This research uses the concept of real option method and uncertainty analysis method to develop a numerical model and to simulate the influence of pond expansion scheduling on the benefit. The model includes generation of future rain data, ponds supplying water, and real option analysis. And in the problem of expansion location and expansion sizing, this research uses traditional optimization to solve the problem.
This research uses optimization model to solve the problem of location and sizing. The result shows that the benefit is significant. And using the real data to optimization model, one can get the optimal benefit will be almost 60 million, but execute capacity in some condition will have no benefit. Through the real option model one can know that early execute capacity expansion will have more benefit. By adding the 2 model we can analyze capacity expansion problem efficiently.
|
author2 |
Nien-Sheng Hsu |
author_facet |
Nien-Sheng Hsu Hsin-Ru Wang 王鑫儒 |
author |
Hsin-Ru Wang 王鑫儒 |
spellingShingle |
Hsin-Ru Wang 王鑫儒 Application of Real Options Analysis to Pond Capacity Expansion Schedule Decision Problems |
author_sort |
Hsin-Ru Wang |
title |
Application of Real Options Analysis to Pond Capacity Expansion Schedule Decision Problems |
title_short |
Application of Real Options Analysis to Pond Capacity Expansion Schedule Decision Problems |
title_full |
Application of Real Options Analysis to Pond Capacity Expansion Schedule Decision Problems |
title_fullStr |
Application of Real Options Analysis to Pond Capacity Expansion Schedule Decision Problems |
title_full_unstemmed |
Application of Real Options Analysis to Pond Capacity Expansion Schedule Decision Problems |
title_sort |
application of real options analysis to pond capacity expansion schedule decision problems |
publishDate |
2009 |
url |
http://ndltd.ncl.edu.tw/handle/07488229253191935259 |
work_keys_str_mv |
AT hsinruwang applicationofrealoptionsanalysistopondcapacityexpansionscheduledecisionproblems AT wángxīnrú applicationofrealoptionsanalysistopondcapacityexpansionscheduledecisionproblems AT hsinruwang yīngyòngshízhìxuǎnzéquánjuédìngpítángkuòchōngshíchéngzhīyánjiū AT wángxīnrú yīngyòngshízhìxuǎnzéquánjuédìngpítángkuòchōngshíchéngzhīyánjiū |
_version_ |
1718259200613679104 |