Using Heuristic Search Methods to Solve Resource Constrained Project Scheduling
碩士 === 國立清華大學 === 工業工程與工程管理學系 === 97 === Abstract This study presents methods to solve single project, non-preemptive infinite mode RCPSP where resources are renewable and the intensity of each activity is fixed within the activity duration. The objective of the problem is to minimize project ma...
Main Authors: | Hung, Chang-Yu, 洪長裕 |
---|---|
Other Authors: | Hung, Yi-Feng |
Format: | Others |
Language: | en_US |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/16279616359666246508 |
Similar Items
-
Exact and heuristic methods for resource constrained project scheduling problem
by: Kooli, Anis
Published: (2012) -
A HYBRID HEURISTIC ALGORITHM FOR SOLVING THE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM (RCPSP)
by: Juan Carlos Rivera, et al. -
Heuristic in Resource-Constrained Project Scheduling --Project Characteristic Estimating Heuristic Performance
by: Huang Chih Jung, et al.
Published: (1993) -
An heuristic scheduling algorithm for resource-constrained project networks.
by: Marsh, Stewart Iden
Published: (2012) -
Using Multiple Trajectory Search Algorithm to solve the Resource-Constrained Project Scheduling Problem
by: Kuan-Cheng Lin, et al.
Published: (2010)