The Impact Assessment of Environmental Quality and Social Development at Formosa Petrochemical Corporation(FPCC) NO.6 Naphtha Cracking Industry Site.
碩士 === 國立中山大學 === 海洋事務研究所 === 97 === The Formosa Petrochemical Corporation (FPCC) has operated the No. 6 Naphtha Cracking industry site at Mailiao of Yunlin County for 14 years since it completed the construction in 1995. Although the plant were assessed according to the process of environmental im...
Main Authors: | Chih-hung Lin, 林智鴻 |
---|---|
Other Authors: | Chiu-Lung Chou |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/52s77g |
Similar Items
-
Evaluation about effect of No. 6 Naphtha Cracking Unit of FPCC operation
by: Ping-fan Wang, et al.
Published: (2008) -
The Impacts of China Petroleum Corp’s Fifth Naphtha Cracker and Formosa Plastics Corp’s Sixth Naphtha Cracker Complex on the Petrochemical Industry in Taiwan
by: Tsung Hsien Hsu, et al.
Published: (2018) -
The Effect of No. 6 Naphtha Cracker Project of Formosa Plastics Groupon Performance and Risk of Formosa Chemicals & Fiber Corporation
by: Tim-Hsi Lin, et al.
Published: (2006) -
News coverage of the environmental impact assessments in Taiwanese petrochemical industry : a comparative study of Kuo-Kuang Petrochemical Project and Formosa Plastics Crop’s Sixth Naphtha Cracker Project
by: Lin, Jia Hong, et al. -
Crisis Communication of Local Governments on Protest against Petrochemical Industry: The Cases of Formosa Chemical & Fiber Corporations in Changhua and Formosa Plastics Corp’s(FPC) Sixth Naphtha Cracker Complex in Yunlin.
by: Ying-Ru Ding, et al.
Published: (2019)