Production Scheduling System using Standard Time as basic
碩士 === 國立屏東科技大學 === 工業管理系所 === 97 === The major purpose of the study is try to solve the problem of manufacturer cannot delivery their products on time. A computer scheduling system based on standard time is developed in the study. The scheduling system can obtain delivery time rapidly of a new orde...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/89053088169014387332 |
id |
ndltd-TW-097NPUS5041082 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-097NPUS50410822016-12-22T04:12:46Z http://ndltd.ncl.edu.tw/handle/89053088169014387332 Production Scheduling System using Standard Time as basic 以標準工時為基礎之排程資訊系統 Wang, Yong-Shun 王泳舜 碩士 國立屏東科技大學 工業管理系所 97 The major purpose of the study is try to solve the problem of manufacturer cannot delivery their products on time. A computer scheduling system based on standard time is developed in the study. The scheduling system can obtain delivery time rapidly of a new order according to standard time of all orders plus a suitable allowance. The production scene needs to feedback the starting time and finish time of all orders in order to re-scheduling all orders. Where there is a delay, there is a quick response from the system. Finally, a simulation validate that a fit standard time, a good production feedback system and an appropriate allowance are the basis for the products can achieve the goal of on time delivery. Ho, Cheng-Pin 何正斌 2009 學位論文 ; thesis 66 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立屏東科技大學 === 工業管理系所 === 97 === The major purpose of the study is try to solve the problem of manufacturer cannot delivery their products on time. A computer scheduling system based on standard time is developed in the study. The scheduling system can obtain delivery time rapidly of a new order according to standard time of all orders plus a suitable allowance. The production scene needs to feedback the starting time and finish time of all orders in order to re-scheduling all orders. Where there is a delay, there is a quick response from the system. Finally, a simulation validate that a fit standard time, a good production feedback system and an appropriate allowance are the basis for the products can achieve the goal of on time delivery.
|
author2 |
Ho, Cheng-Pin |
author_facet |
Ho, Cheng-Pin Wang, Yong-Shun 王泳舜 |
author |
Wang, Yong-Shun 王泳舜 |
spellingShingle |
Wang, Yong-Shun 王泳舜 Production Scheduling System using Standard Time as basic |
author_sort |
Wang, Yong-Shun |
title |
Production Scheduling System using Standard Time as basic |
title_short |
Production Scheduling System using Standard Time as basic |
title_full |
Production Scheduling System using Standard Time as basic |
title_fullStr |
Production Scheduling System using Standard Time as basic |
title_full_unstemmed |
Production Scheduling System using Standard Time as basic |
title_sort |
production scheduling system using standard time as basic |
publishDate |
2009 |
url |
http://ndltd.ncl.edu.tw/handle/89053088169014387332 |
work_keys_str_mv |
AT wangyongshun productionschedulingsystemusingstandardtimeasbasic AT wángyǒngshùn productionschedulingsystemusingstandardtimeasbasic AT wangyongshun yǐbiāozhǔngōngshíwèijīchǔzhīpáichéngzīxùnxìtǒng AT wángyǒngshùn yǐbiāozhǔngōngshíwèijīchǔzhīpáichéngzīxùnxìtǒng |
_version_ |
1718403503324397568 |