A Study of Modified Fuzzy GERT on Project Duration Evaluation
碩士 === 國立屏東科技大學 === 工業管理系所 === 97 === GERT networks have been widely applied in different domains. The parameters of GERT networks are usually determined by the decision makers’ subjective opinions or experts’ suggestions. It implies that the values of parameters in GERT networks are imprecise and u...
Main Authors: | Chih-Chieh Chuang, 莊誌傑 |
---|---|
Other Authors: | Hsiang-Hsi Huang |
Language: | zh-TW |
Online Access: | http://ndltd.ncl.edu.tw/handle/00539570816626360802 |
Similar Items
-
A Study of Modified Fuzzy GERT on Project Duration Evaluation
by: Chih-Chieh Chuang, et al.
Published: (2009) -
Analysis of the Transmission of Project Duration and Cost Impacts Based on the GERT Network Technique
by: Zhiyong Li, et al.
Published: (2019-03-01) -
GERT Model for Studying Economics Design of Exponential Weighted
by: Chuang,Shao-Tso, et al.
Published: (1998) -
The Research of Fuzzy Reliability using GERT Technology
by: Zo-Young Kuo, et al.
Published: (2000) -
The Model Formulation and Development of Fuzzy GERT Network
by: 林瑞旺
Published: (1998)