A study of Artificial Neural Network to forecast the Productivity of Shield-Tunneling Method-A Case Study on Kaohsiung Mass Rapid Transport section CO4
碩士 === 國立高雄第一科技大學 === 營建工程所 === 97 === The most construction of KMRT have been achieved and operated fully in September, 2008. It’s the beginning of the construction by learning and self-criticism, but the whole construction of the momentous traffic construction was influenced by STM. the cost of th...
Main Authors: | Hsiang-Yu Liao, 廖祥宇 |
---|---|
Other Authors: | Chien-Liang Lin |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/62254613232253881185 |
Similar Items
-
A study of Back-Propagation Network to forecast the Productivity of Shield-Tunneling Method-A Case Study on Kaohsiung Mass Rapid Transport tunnel
by: Yu-feng Ya, et al.
Published: (2008) -
Study On Productivity Of Shielded-Tunneling MethodA Case Study On Kaohsiung Mass Rapid Transit
by: Kuo-Hsien Lee, et al.
Published: (2007) -
The Study of the Technology Transfer of International Joint Ventures—A Case Study of Shield Tunneling for Kaohsiung Mass Rapid Transit Project
by: Ming-Chuan Chang, et al.
Published: (2006) -
A Study of Reconstruction for Ground Settlement – The LUO09 Shield Tunnel for the Kaohsiung MRT System CO2 Section
by: Wen-Liang Wang, et al.
Published: (2011) -
Study of Ground Movement and Stress on Segements Induced by Shield Tunnelling in Sandy Soil at Kaohsiung
by: Chen Li Kung, et al.
Published: (2008)