Neural Networks for Estimating Duration of Projects with Multiple Paths
碩士 === 國立高雄第一科技大學 === 營建工程所 === 97 === Construction projects are often quite complex with a lot of uncertainty about the required duration. For a project planner, it is important to ensure project completion within the deadline. The critical path method (CPM) uses single-time estimation and does not...
Main Authors: | Yun-Da Chuang, 莊昀達 |
---|---|
Other Authors: | Li-Chung Chao |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/73608747712421385248 |
Similar Items
-
Graph Neural Networks with Multiple Feature Extraction Paths for Chemical Property Estimation
by: Sho Ishida, et al.
Published: (2021-05-01) -
Estimation of path duration in mobile ad-hoc networks: A theoretical study
by: Devaraj, Sreekalyan
Published: (2010) -
Reducing the Number of Paths in a Minimized Project-Network With Given Bounds on the Durations of Activities
by: Dmitri Viattchenin
Published: (2015-01-01) -
Estimation of Monthly Sunshine Duration in Turkey Using Artificial Neural Networks
by: H. M. Kandirmaz, et al.
Published: (2014-01-01) -
Estimating the Duration of Treatment and Hospitalization Costs Using Neural Network Approach
by: Saeed Samadi, et al.
Published: (2012-03-01)