A Study on Factors That impact Acquisition Schedule for Military Spare Parts — The Case of HMMWV
碩士 === 國防大學管理學院 === 運籌管理學系 === 97 === Under the environment of supply chain and global logistics management, it remains the ultimate goal for each and every logistics management department to promptly respond to requirement arises form within the field units through efficient and effective managemen...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/39470368699778300887 |
id |
ndltd-TW-097NDMC1715024 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-097NDMC17150242015-10-13T14:53:15Z http://ndltd.ncl.edu.tw/handle/39470368699778300887 A Study on Factors That impact Acquisition Schedule for Military Spare Parts — The Case of HMMWV 國軍料件獲得時程影響因子之研究—以悍馬車為例 Yu,Kai-Chih 游開智 碩士 國防大學管理學院 運籌管理學系 97 Under the environment of supply chain and global logistics management, it remains the ultimate goal for each and every logistics management department to promptly respond to requirement arises form within the field units through efficient and effective management practices. However, if the spare parts acquisition timelines were delayed extensively, downtime for major equipment will increase as a result of failing to provide spare parts needed for maintenance in adequate and timely fashion. From the perspective of managers responsible for spare parts acquisition of Taiwanese armed forces, this study attempts to discuss and analyze various key “nodes”along the path of armed forces, spare parts acquisition operation by utilizing the concept and philosophy of “critical chain project management ”and “velocity management”. By analyzing influencing factors of significant importance via the methodology of expert interview and survey. Six major influencing factors contributing to the delaying of spare parts acquisition have been identified by this research, to include failure of military services in filing and submitting their respective spare parts requirement in a timely manner. It is of utmost importance that we enhance logistics and supply chain management, reinforce guidance and internal control so as detect abnormality early on and take preventive/preemptive actions to mitigate adversarial consequences. Jen,Ching Tsung 任慶宗 2009 學位論文 ; thesis 65 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國防大學管理學院 === 運籌管理學系 === 97 === Under the environment of supply chain and global logistics management, it remains the ultimate goal for each and every logistics management department to promptly respond to requirement arises form within the field units through efficient and effective management practices. However, if the spare parts acquisition timelines were delayed extensively, downtime for major equipment will increase as a result of failing to provide spare parts needed for maintenance in adequate and timely fashion.
From the perspective of managers responsible for spare parts acquisition of Taiwanese armed forces, this study attempts to discuss and analyze various key “nodes”along the path of armed forces, spare parts acquisition operation by utilizing the concept and philosophy of “critical chain project management ”and “velocity management”. By analyzing influencing factors of significant importance via the methodology of expert interview and survey.
Six major influencing factors contributing to the delaying of spare parts acquisition have been identified by this research, to include failure of military services in filing and submitting their respective spare parts requirement in a timely manner. It is of utmost importance that we enhance logistics and supply chain management, reinforce guidance and internal control so as detect abnormality early on and take preventive/preemptive actions to mitigate adversarial consequences.
|
author2 |
Jen,Ching Tsung |
author_facet |
Jen,Ching Tsung Yu,Kai-Chih 游開智 |
author |
Yu,Kai-Chih 游開智 |
spellingShingle |
Yu,Kai-Chih 游開智 A Study on Factors That impact Acquisition Schedule for Military Spare Parts — The Case of HMMWV |
author_sort |
Yu,Kai-Chih |
title |
A Study on Factors That impact Acquisition Schedule for Military Spare Parts — The Case of HMMWV |
title_short |
A Study on Factors That impact Acquisition Schedule for Military Spare Parts — The Case of HMMWV |
title_full |
A Study on Factors That impact Acquisition Schedule for Military Spare Parts — The Case of HMMWV |
title_fullStr |
A Study on Factors That impact Acquisition Schedule for Military Spare Parts — The Case of HMMWV |
title_full_unstemmed |
A Study on Factors That impact Acquisition Schedule for Military Spare Parts — The Case of HMMWV |
title_sort |
study on factors that impact acquisition schedule for military spare parts — the case of hmmwv |
publishDate |
2009 |
url |
http://ndltd.ncl.edu.tw/handle/39470368699778300887 |
work_keys_str_mv |
AT yukaichih astudyonfactorsthatimpactacquisitionscheduleformilitarysparepartsthecaseofhmmwv AT yóukāizhì astudyonfactorsthatimpactacquisitionscheduleformilitarysparepartsthecaseofhmmwv AT yukaichih guójūnliàojiànhuòdéshíchéngyǐngxiǎngyīnzizhīyánjiūyǐhànmǎchēwèilì AT yóukāizhì guójūnliàojiànhuòdéshíchéngyǐngxiǎngyīnzizhīyánjiūyǐhànmǎchēwèilì AT yukaichih studyonfactorsthatimpactacquisitionscheduleformilitarysparepartsthecaseofhmmwv AT yóukāizhì studyonfactorsthatimpactacquisitionscheduleformilitarysparepartsthecaseofhmmwv |
_version_ |
1717760764927803392 |