Model Development for Risk Assessment of Rapid Transit Construction
碩士 === 國立中央大學 === 營建管理研究所碩士在職專班 === 97 === Rapid Transit System, which features as a metropolitan public transportation, has great impact on the social and public levels if accidents occur. It is often difficult to calculate and recover the loss caused to the Owner and contractors. The most efficien...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/d6vnv5 |
id |
ndltd-TW-097NCU05512005 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-097NCU055120052019-05-15T19:27:42Z http://ndltd.ncl.edu.tw/handle/d6vnv5 Model Development for Risk Assessment of Rapid Transit Construction 捷運工程施工風險評估模式之研究 Sian-Zong Hong 洪顯宗 碩士 國立中央大學 營建管理研究所碩士在職專班 97 Rapid Transit System, which features as a metropolitan public transportation, has great impact on the social and public levels if accidents occur. It is often difficult to calculate and recover the loss caused to the Owner and contractors. The most efficient way to reduce or prevent accidents in construction sites is to take precautionary and adjustment measures. However, under the current Rapid Transit System, the construction risk-assessment is made based on intuition developed from individual working interfaces. As a result, it becomes crucial to establish a simple and effective risk assessment method applicable to different stages of the construction work. The purpose of this dissertation is to set up a construction risk assessment module for the high-risk Rapid Transit System construction items. And the purpose to set up such module is to enable risk assessment management under different construction risk factors. The assessment items for impact factors use the Fuzzy Analytic Hierarchy Process (FAHP) as a main source of weighing judgment to determine the Risk Breakdown Structure (RBS) of Rapid Transit System construction. In addition, the internationally accepted and nationally applicable Risk Evaluation Criteria are being studied and revised with the Borda’s Function to establish the complete structure of the risk assessment structure. A case study on the Tunnel Boring Machine is used here to exemplify the discussion of reference on Rapid Transit System and collection of practical ideas from real executors of Rapid Transit System construction, in order to reach conclusion for the rapid transit system construction risk assessment module. Rong-Yau Huang Chien-Chung Li 黃榮堯 李建中 2009 學位論文 ; thesis 88 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立中央大學 === 營建管理研究所碩士在職專班 === 97 === Rapid Transit System, which features as a metropolitan public transportation, has great impact on the social and public levels if accidents occur. It is often difficult to calculate and recover the loss caused to the Owner and contractors. The most efficient way to reduce or prevent accidents in construction sites is to take precautionary and adjustment measures. However, under the current Rapid Transit System, the construction risk-assessment is made based on intuition developed from individual working interfaces. As a result, it becomes crucial to establish a simple and effective risk assessment method applicable to different stages of the construction work. The purpose of this dissertation is to set up a construction risk assessment module for the high-risk Rapid Transit System construction items. And the purpose to set up such module is to enable risk assessment management under different construction risk factors. The assessment items for impact factors use the Fuzzy Analytic Hierarchy Process (FAHP) as a main source of weighing judgment to determine the Risk Breakdown Structure (RBS) of Rapid Transit System construction. In addition, the internationally accepted and nationally applicable Risk Evaluation Criteria are being studied and revised with the Borda’s Function to establish the complete structure of the risk assessment structure. A case study on the Tunnel Boring Machine is used here to exemplify the discussion of reference on Rapid Transit System and collection of practical ideas from real executors of Rapid Transit System construction, in order to reach conclusion for the rapid transit system construction risk assessment module.
|
author2 |
Rong-Yau Huang |
author_facet |
Rong-Yau Huang Sian-Zong Hong 洪顯宗 |
author |
Sian-Zong Hong 洪顯宗 |
spellingShingle |
Sian-Zong Hong 洪顯宗 Model Development for Risk Assessment of Rapid Transit Construction |
author_sort |
Sian-Zong Hong |
title |
Model Development for Risk Assessment of Rapid Transit Construction |
title_short |
Model Development for Risk Assessment of Rapid Transit Construction |
title_full |
Model Development for Risk Assessment of Rapid Transit Construction |
title_fullStr |
Model Development for Risk Assessment of Rapid Transit Construction |
title_full_unstemmed |
Model Development for Risk Assessment of Rapid Transit Construction |
title_sort |
model development for risk assessment of rapid transit construction |
publishDate |
2009 |
url |
http://ndltd.ncl.edu.tw/handle/d6vnv5 |
work_keys_str_mv |
AT sianzonghong modeldevelopmentforriskassessmentofrapidtransitconstruction AT hóngxiǎnzōng modeldevelopmentforriskassessmentofrapidtransitconstruction AT sianzonghong jiéyùngōngchéngshīgōngfēngxiǎnpínggūmóshìzhīyánjiū AT hóngxiǎnzōng jiéyùngōngchéngshīgōngfēngxiǎnpínggūmóshìzhīyánjiū |
_version_ |
1719089141195472896 |