Summary: | 碩士 === 國立中央大學 === 工業管理研究所碩士在職專班 === 97 === Most of the facility planning problems and location allocation studies are developed on the same plane. However, due to light equipments and expensive spaces, a lot of electronic manufacturing enterprises always construct floor-buildings to expand production plants, in many cases, the requirement of these organizations is stereo-facility planning solving schemes. This paper consists of two stages operation methods–one is Location Allocation Model, and the other is AHP(Analytic Hierarchy Process).The research used two semiconductor manufacturing corporations as examples, that are called X and Y. All of functions needed to be allocated in a brand new building at the park of this enterprise are non-manufacturing facilities, that are from receiving areas, incoming material inspection areas, direct-material and indirect-material warehouses, material freezing warehouses, wafer grinding, wafer warehouses, finished-good warehouses, to shipping areas. The first stage is to apply Location Allocation Model to allocate several different function facilities in three different floors and to minimize facility construction cost under several model constrains. In the second stage ,we used AHP method to evaluate several proposals and find out the relatively feasible proposal.
|