Summary: | 碩士 === 國立中央大學 === 土木工程學系碩士在職專班 === 97 === onsideration and so on utilizes in the wall pile, the counter-circulation pile, the entire drive pipe machine pile labor law and makes the comparison and various types foundation pile utilizes in excavates union of use in the labor law to do deeply compares, but chooses compares efficient and the conveniences labor of law.
Utilizes in the loading test wall of pile project in view of the new board special zone bridge peak building in the extra-high building in the heavy before and after benefit analysis, by this research, has in-depth understanding to construction and the carrying capacity the wall pile, in the nonessential cost disbursement''s managerial technique and the quality and guaranteed safely under lets the cost, the technology, the time achieve the highest benefit goal of for this research.
This research is aims at choice and the foundation pile location the plan design stage grounding law after the heavy experiment the benefit analysis to approaches for the research, and take new board special zone bridge peak building foundation engineering as range of study.
In the plan design stage, the labor method choice has the close relation directly with the project cost, has the current price on market except the material itself especially, changes and so on technology, machines and tools, personnel, time interval form direct or street''s influence, of machinery equipment regarding various types foundation pile project use in the market share, the construction feasibility, the technical personnel, the time and the method c
|