Validating Laboratory Control Chart

碩士 === 國立交通大學 === 統計學研究所 === 97 === Typically control charts should involve phases I and II chartings of different purposes. In consideration of financial cost and analyst’s time, the laboratory control charting generally do not follow the process recommended for manufacturing process control. For p...

Full description

Bibliographic Details
Main Authors: Wu, Zong-Ling, 吳宗霖
Other Authors: Chen, Lin-An
Format: Others
Language:en_US
Online Access:http://ndltd.ncl.edu.tw/handle/81323234364282910145
Description
Summary:碩士 === 國立交通大學 === 統計學研究所 === 97 === Typically control charts should involve phases I and II chartings of different purposes. In consideration of financial cost and analyst’s time, the laboratory control charting generally do not follow the process recommended for manufacturing process control. For phase I charting, we propose several tests using for testing if a computed control chart is appropriate for the distribution representing the laboratory process. Power comparisons for the proposed tests are performed and the results are displayed and discussed.