Quantification of the lump-sum-based pay items in Mass Rapid Transit Projects
碩士 === 國立交通大學 === 工學院碩士在職專班工程技術與管理組 === 97 === In a Mass Rapid Transit (MRT) construction project, the construction duration usually is very long and construction cost items (or pay items) are numerous. For those pay items that cannot easily quantified or their associated construction methods have n...
Main Authors: | Huang, Hsin-Hsuan, 黃馨萱 |
---|---|
Other Authors: | Wang, Wei-Chih |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/74942787312619067842 |
Similar Items
-
The Project Management Framework of a Large-scale Lump Sum Turnkey Project
by: Rong-Yuh Hwang, et al.
Published: (2011) -
Variation order in lump sum contract
by: Mohayidin, Noor Amalina
Published: (2014) -
The Study of Controversy in Prototype Lump-sum Contract for Public Construction Projects in Taiwan
by: Chun-Yuan Tseng, et al.
Published: (2009) -
A Study of Risk Management forTendering an International Lump-sum Project
by: Ming Gen, Lee, et al.
Published: (2008) -
The Lump Sum: A Theory of Modal Parts
by: Wallace, M.
Published: (2019)