The overall efficiency evaluation of the wastewater treatment plant and gray water reclamation system

碩士 === 國立暨南國際大學 === 土木工程學系 === 97 === The wastewater treatment plant in National Chi Nan University played an important role of prevention and control of regional water pollution. As the more strict regulation of environmental protection and the outdated apparatus of treatment plant, the treatment a...

Full description

Bibliographic Details
Main Authors: Shou-De Chen, 陳守德
Other Authors: Yung-Pin Tsai
Format: Others
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/86995869835543357828
id ndltd-TW-097NCNU0015005
record_format oai_dc
spelling ndltd-TW-097NCNU00150052015-11-20T04:19:11Z http://ndltd.ncl.edu.tw/handle/86995869835543357828 The overall efficiency evaluation of the wastewater treatment plant and gray water reclamation system 污水處理廠及中水回收系統之整體效能評估 Shou-De Chen 陳守德 碩士 國立暨南國際大學 土木工程學系 97 The wastewater treatment plant in National Chi Nan University played an important role of prevention and control of regional water pollution. As the more strict regulation of environmental protection and the outdated apparatus of treatment plant, the treatment apparatus designed in the past have already not accorded with the new demand nowadays. The source of water is limited due to the geographical factor. In order to increase the available source of water, promotion of the gray water to retrieve and reuse is necessary. The gray water reclamation system constructed in National Chi Nan University had not suited measures to local conditions, and it resulted in the difficulty of operation. Thus, this study assessed systematically the functionalities of the wastewater treatment plant and the grey water reclamation system to improve the problems of old apparatus and operational deficiency. These two systems were assessed according to the water standard of gray water and further suggested the strategies to improve their efficiencies. There were nine deficiencies in both of the wastewater treatment plant and gray water reclamation systems. The improvement of five problems, including dissolve oxygen control, mechanical agitator of Sequencing Batch Reactor (SBR), sludge thickener, injector system of disinfection unit and reservoir, had already been finished. In addition, the assessment of other problems, including coarse bubble diffuser of SBR, mechanical screener of rainwater collection system, water pipeline of gray water reclamation system and lavatory system in dormitories, had also been finished, but not been improved yet. In the study, residual chlorine concentration was controlled by chlorine measurement instrument instead of conventional fix dose control in disinfection unit. The experimental result showed that Escherichia coli in gray water can be reduced to accord with gray water quality standard while the chlorine residual concentration is maintained at the level of 2-2.5 mgl-1. Because of the reservoir has already faced to eutrophication problem. It is needed to enhance the nitrogen and phosphorus removal of the wastewater treatment plant. In the nitrogen part, 25% removal efficiencies of nitrate can be improved by controlling the stage time of the SBR process. By using sodium acetic acid as carbon source in anoxic phase can further achieve 30% removal efficiencies of nitrate. In phosphate part, phosphate can be removed by poly aluminum chloride (PAC). About 100% removal efficiencies of phosphorus could be achieved when PAC demand was 40 mgl-1,. The total PAC demand is 6 ton/year, and the cost of expenses for PAC is 228,000 NT$/year. The amount of produced chemical sludge is 24 ton/year, and the cost of expenses for treatment and disposal is 96,000 NT$/year. Yung-Pin Tsai 蔡勇斌 2009 學位論文 ; thesis 122 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立暨南國際大學 === 土木工程學系 === 97 === The wastewater treatment plant in National Chi Nan University played an important role of prevention and control of regional water pollution. As the more strict regulation of environmental protection and the outdated apparatus of treatment plant, the treatment apparatus designed in the past have already not accorded with the new demand nowadays. The source of water is limited due to the geographical factor. In order to increase the available source of water, promotion of the gray water to retrieve and reuse is necessary. The gray water reclamation system constructed in National Chi Nan University had not suited measures to local conditions, and it resulted in the difficulty of operation. Thus, this study assessed systematically the functionalities of the wastewater treatment plant and the grey water reclamation system to improve the problems of old apparatus and operational deficiency. These two systems were assessed according to the water standard of gray water and further suggested the strategies to improve their efficiencies. There were nine deficiencies in both of the wastewater treatment plant and gray water reclamation systems. The improvement of five problems, including dissolve oxygen control, mechanical agitator of Sequencing Batch Reactor (SBR), sludge thickener, injector system of disinfection unit and reservoir, had already been finished. In addition, the assessment of other problems, including coarse bubble diffuser of SBR, mechanical screener of rainwater collection system, water pipeline of gray water reclamation system and lavatory system in dormitories, had also been finished, but not been improved yet. In the study, residual chlorine concentration was controlled by chlorine measurement instrument instead of conventional fix dose control in disinfection unit. The experimental result showed that Escherichia coli in gray water can be reduced to accord with gray water quality standard while the chlorine residual concentration is maintained at the level of 2-2.5 mgl-1. Because of the reservoir has already faced to eutrophication problem. It is needed to enhance the nitrogen and phosphorus removal of the wastewater treatment plant. In the nitrogen part, 25% removal efficiencies of nitrate can be improved by controlling the stage time of the SBR process. By using sodium acetic acid as carbon source in anoxic phase can further achieve 30% removal efficiencies of nitrate. In phosphate part, phosphate can be removed by poly aluminum chloride (PAC). About 100% removal efficiencies of phosphorus could be achieved when PAC demand was 40 mgl-1,. The total PAC demand is 6 ton/year, and the cost of expenses for PAC is 228,000 NT$/year. The amount of produced chemical sludge is 24 ton/year, and the cost of expenses for treatment and disposal is 96,000 NT$/year.
author2 Yung-Pin Tsai
author_facet Yung-Pin Tsai
Shou-De Chen
陳守德
author Shou-De Chen
陳守德
spellingShingle Shou-De Chen
陳守德
The overall efficiency evaluation of the wastewater treatment plant and gray water reclamation system
author_sort Shou-De Chen
title The overall efficiency evaluation of the wastewater treatment plant and gray water reclamation system
title_short The overall efficiency evaluation of the wastewater treatment plant and gray water reclamation system
title_full The overall efficiency evaluation of the wastewater treatment plant and gray water reclamation system
title_fullStr The overall efficiency evaluation of the wastewater treatment plant and gray water reclamation system
title_full_unstemmed The overall efficiency evaluation of the wastewater treatment plant and gray water reclamation system
title_sort overall efficiency evaluation of the wastewater treatment plant and gray water reclamation system
publishDate 2009
url http://ndltd.ncl.edu.tw/handle/86995869835543357828
work_keys_str_mv AT shoudechen theoverallefficiencyevaluationofthewastewatertreatmentplantandgraywaterreclamationsystem
AT chénshǒudé theoverallefficiencyevaluationofthewastewatertreatmentplantandgraywaterreclamationsystem
AT shoudechen wūshuǐchùlǐchǎngjízhōngshuǐhuíshōuxìtǒngzhīzhěngtǐxiàonéngpínggū
AT chénshǒudé wūshuǐchùlǐchǎngjízhōngshuǐhuíshōuxìtǒngzhīzhěngtǐxiàonéngpínggū
AT shoudechen overallefficiencyevaluationofthewastewatertreatmentplantandgraywaterreclamationsystem
AT chénshǒudé overallefficiencyevaluationofthewastewatertreatmentplantandgraywaterreclamationsystem
_version_ 1718132635639742464