The application of a new dispatching rule and simulation in solving the multiple criteria decision-making of due date oriented problem for IC packaging manufacturing

碩士 === 國立成功大學 === 製造工程研究所碩博士班 === 97 === In the era of the knowledge economy, the application of the electronic products is becoming more extensive. With the shortening of products life cycle and diversification of customer’s demand, IC packaging industry must promote the technological ability of pa...

Full description

Bibliographic Details
Main Authors: Hsin-yi Wang, 王馨儀
Other Authors: Taho Yang
Format: Others
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/76569817916183775314
id ndltd-TW-097NCKU5621012
record_format oai_dc
spelling ndltd-TW-097NCKU56210122016-05-04T04:25:26Z http://ndltd.ncl.edu.tw/handle/76569817916183775314 The application of a new dispatching rule and simulation in solving the multiple criteria decision-making of due date oriented problem for IC packaging manufacturing 應用創新派工法則結合模擬求解IC封裝廠交期導向之多準則決策問題 Hsin-yi Wang 王馨儀 碩士 國立成功大學 製造工程研究所碩博士班 97 In the era of the knowledge economy, the application of the electronic products is becoming more extensive. With the shortening of products life cycle and diversification of customer’s demand, IC packaging industry must promote the technological ability of packaging constantly that is in order to deal with intense competition pressure gradually in the future. Furthermore, IC industry is oriented towards manufacturing and service that the key competitiveness is service level. This paper develops a new dispatching rule, measures the lot loss integrity exposure in order to adjuste the sublots sequence. The proposed procedure is illustrated to begin defining the logic of a new dispatching rule, to describe the product line by using simulation tool, and to experiment the dispatching rules for implementing the improved alternative. Empirical results show that the cycle time and wait-to-batch time performances of the proposed methodology are usually better than the conventional dispatching rules. This paper considers four performance measure including cycle time, mean tardiness, service level and wait-to-batch time. In order to improve the performances of the whole production, the research applies multiple criteria decision-making method to decide the suitable dispatching rules for bottleneck workstations. Taho Yang 楊大和 2009 學位論文 ; thesis 83 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 製造工程研究所碩博士班 === 97 === In the era of the knowledge economy, the application of the electronic products is becoming more extensive. With the shortening of products life cycle and diversification of customer’s demand, IC packaging industry must promote the technological ability of packaging constantly that is in order to deal with intense competition pressure gradually in the future. Furthermore, IC industry is oriented towards manufacturing and service that the key competitiveness is service level. This paper develops a new dispatching rule, measures the lot loss integrity exposure in order to adjuste the sublots sequence. The proposed procedure is illustrated to begin defining the logic of a new dispatching rule, to describe the product line by using simulation tool, and to experiment the dispatching rules for implementing the improved alternative. Empirical results show that the cycle time and wait-to-batch time performances of the proposed methodology are usually better than the conventional dispatching rules. This paper considers four performance measure including cycle time, mean tardiness, service level and wait-to-batch time. In order to improve the performances of the whole production, the research applies multiple criteria decision-making method to decide the suitable dispatching rules for bottleneck workstations.
author2 Taho Yang
author_facet Taho Yang
Hsin-yi Wang
王馨儀
author Hsin-yi Wang
王馨儀
spellingShingle Hsin-yi Wang
王馨儀
The application of a new dispatching rule and simulation in solving the multiple criteria decision-making of due date oriented problem for IC packaging manufacturing
author_sort Hsin-yi Wang
title The application of a new dispatching rule and simulation in solving the multiple criteria decision-making of due date oriented problem for IC packaging manufacturing
title_short The application of a new dispatching rule and simulation in solving the multiple criteria decision-making of due date oriented problem for IC packaging manufacturing
title_full The application of a new dispatching rule and simulation in solving the multiple criteria decision-making of due date oriented problem for IC packaging manufacturing
title_fullStr The application of a new dispatching rule and simulation in solving the multiple criteria decision-making of due date oriented problem for IC packaging manufacturing
title_full_unstemmed The application of a new dispatching rule and simulation in solving the multiple criteria decision-making of due date oriented problem for IC packaging manufacturing
title_sort application of a new dispatching rule and simulation in solving the multiple criteria decision-making of due date oriented problem for ic packaging manufacturing
publishDate 2009
url http://ndltd.ncl.edu.tw/handle/76569817916183775314
work_keys_str_mv AT hsinyiwang theapplicationofanewdispatchingruleandsimulationinsolvingthemultiplecriteriadecisionmakingofduedateorientedproblemforicpackagingmanufacturing
AT wángxīnyí theapplicationofanewdispatchingruleandsimulationinsolvingthemultiplecriteriadecisionmakingofduedateorientedproblemforicpackagingmanufacturing
AT hsinyiwang yīngyòngchuàngxīnpàigōngfǎzéjiéhémónǐqiújiěicfēngzhuāngchǎngjiāoqīdǎoxiàngzhīduōzhǔnzéjuécèwèntí
AT wángxīnyí yīngyòngchuàngxīnpàigōngfǎzéjiéhémónǐqiújiěicfēngzhuāngchǎngjiāoqīdǎoxiàngzhīduōzhǔnzéjuécèwèntí
AT hsinyiwang applicationofanewdispatchingruleandsimulationinsolvingthemultiplecriteriadecisionmakingofduedateorientedproblemforicpackagingmanufacturing
AT wángxīnyí applicationofanewdispatchingruleandsimulationinsolvingthemultiplecriteriadecisionmakingofduedateorientedproblemforicpackagingmanufacturing
_version_ 1718257462562258944