Throughput Control Study for Flow Shop with Multiple Processors (as MLCC Industry Process)

碩士 === 國立成功大學 === 高階管理碩士在職專班 === 97 === Modern manufacturing firms compete not only on the traditional basis of product quality and price, but also increasingly on the basis of lead time and service level, which are both affected by cycle time. General research, for handing in a issue of lead time c...

Full description

Bibliographic Details
Main Authors: Hsien-ming Lee, 李賢銘
Other Authors: none
Format: Others
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/89550978320500347252
Description
Summary:碩士 === 國立成功大學 === 高階管理碩士在職專班 === 97 === Modern manufacturing firms compete not only on the traditional basis of product quality and price, but also increasingly on the basis of lead time and service level, which are both affected by cycle time. General research, for handing in a issue of lead time control and service level, all focus on cycle time reduction or Kanban, the bill-board is managed. But there is a little study on the throughput control for “Floor Shop with Multiple processors”. This paper provides the mechanism which access the PERT skill of L.F. (latest finish) and dispatching rule of EDD (earliest due date) to control the throughput at some critical or key stages for each production lot to ensure the fulfillment of delivery lead time & service level.