Wastage Control of Rebar in Construction in Case of Rende-Wenshan Road of Construction Project Lot 3-1 & 3-2

碩士 === 國立中興大學 === 土木工程學系所 === 97 === The cost of the steel rebar is a major budget for constructional engineering. It has two ways to order rebar, one is fixed length rebar and the other is non-fixed length. However, it has an additional cost to pay to order fixed length rebar. In contest it has a l...

Full description

Bibliographic Details
Main Authors: Chien-Ching Hsiao, 蕭建青
Other Authors: 朱明信
Format: Others
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/17942099991052321829
id ndltd-TW-097NCHU5015023
record_format oai_dc
spelling ndltd-TW-097NCHU50150232016-04-29T04:19:43Z http://ndltd.ncl.edu.tw/handle/17942099991052321829 Wastage Control of Rebar in Construction in Case of Rende-Wenshan Road of Construction Project Lot 3-1 & 3-2 營建工程鋼筋損耗控制實務-以仁德文賢3-1,3-2號道路工程為例 Chien-Ching Hsiao 蕭建青 碩士 國立中興大學 土木工程學系所 97 The cost of the steel rebar is a major budget for constructional engineering. It has two ways to order rebar, one is fixed length rebar and the other is non-fixed length. However, it has an additional cost to pay to order fixed length rebar. In contest it has a lot of waste steel that cut the rebar on site for ordering non-fixing length rebar. Therefore to reduce the quantity of waste steel by using non fixed length rebar is a study topic in constructional engineering. The finishing date of constructional engineering is always delay because of the bad weather, materials supply delay, and the local custom. In the case of catastrophic reconstruction engineering that all the tasks must be completed in the certain period. In that situation ,to order fixed length rebar is not suitable because it need more time to product. Instead the non fixed length rebar can be used and how to reduce the quantity of waste steel due to cut off on site is more important for the project management. The purpose of the research is to plan how to cut the rebar on site in order to reduce the waste steel and find the economical cutting combination method. Furthermore, in contrast with fixed length rebar to find how much of the cost difference between them. The drainage system, piling, foundation and pier of the viaduct of the Rende-Wenshan Road Construction Project Lot 3-1 & 3-2 are the examples in this reseach. And the result will helpful to cut down the cost for constructional engineering management. 朱明信 2009 學位論文 ; thesis 64 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中興大學 === 土木工程學系所 === 97 === The cost of the steel rebar is a major budget for constructional engineering. It has two ways to order rebar, one is fixed length rebar and the other is non-fixed length. However, it has an additional cost to pay to order fixed length rebar. In contest it has a lot of waste steel that cut the rebar on site for ordering non-fixing length rebar. Therefore to reduce the quantity of waste steel by using non fixed length rebar is a study topic in constructional engineering. The finishing date of constructional engineering is always delay because of the bad weather, materials supply delay, and the local custom. In the case of catastrophic reconstruction engineering that all the tasks must be completed in the certain period. In that situation ,to order fixed length rebar is not suitable because it need more time to product. Instead the non fixed length rebar can be used and how to reduce the quantity of waste steel due to cut off on site is more important for the project management. The purpose of the research is to plan how to cut the rebar on site in order to reduce the waste steel and find the economical cutting combination method. Furthermore, in contrast with fixed length rebar to find how much of the cost difference between them. The drainage system, piling, foundation and pier of the viaduct of the Rende-Wenshan Road Construction Project Lot 3-1 & 3-2 are the examples in this reseach. And the result will helpful to cut down the cost for constructional engineering management.
author2 朱明信
author_facet 朱明信
Chien-Ching Hsiao
蕭建青
author Chien-Ching Hsiao
蕭建青
spellingShingle Chien-Ching Hsiao
蕭建青
Wastage Control of Rebar in Construction in Case of Rende-Wenshan Road of Construction Project Lot 3-1 & 3-2
author_sort Chien-Ching Hsiao
title Wastage Control of Rebar in Construction in Case of Rende-Wenshan Road of Construction Project Lot 3-1 & 3-2
title_short Wastage Control of Rebar in Construction in Case of Rende-Wenshan Road of Construction Project Lot 3-1 & 3-2
title_full Wastage Control of Rebar in Construction in Case of Rende-Wenshan Road of Construction Project Lot 3-1 & 3-2
title_fullStr Wastage Control of Rebar in Construction in Case of Rende-Wenshan Road of Construction Project Lot 3-1 & 3-2
title_full_unstemmed Wastage Control of Rebar in Construction in Case of Rende-Wenshan Road of Construction Project Lot 3-1 & 3-2
title_sort wastage control of rebar in construction in case of rende-wenshan road of construction project lot 3-1 & 3-2
publishDate 2009
url http://ndltd.ncl.edu.tw/handle/17942099991052321829
work_keys_str_mv AT chienchinghsiao wastagecontrolofrebarinconstructionincaseofrendewenshanroadofconstructionprojectlot3132
AT xiāojiànqīng wastagecontrolofrebarinconstructionincaseofrendewenshanroadofconstructionprojectlot3132
AT chienchinghsiao yíngjiàngōngchénggāngjīnsǔnhàokòngzhìshíwùyǐréndéwénxián3132hàodàolùgōngchéngwèilì
AT xiāojiànqīng yíngjiàngōngchénggāngjīnsǔnhàokòngzhìshíwùyǐréndéwénxián3132hàodàolùgōngchéngwèilì
_version_ 1718251838921244672