Lighting Simulation and Analysis for 69kV Transmission Line with Coupling Ground Wire

碩士 === 國立高雄應用科技大學 === 電機工程系 === 97 === 69kV transmission line due to lightning and line voltage dip caused by the accident beyond. To reduce the occurrence of mine-affected, although Taipower positive measures to improve the implementation of mine hard to achieve a reasonable improvement targets....

Full description

Bibliographic Details
Main Authors: Wu-Chang Chen, 陳武昌
Other Authors: Ming-Yuan Cho
Format: Others
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/84044613221202444916
id ndltd-TW-097KUAS8442097
record_format oai_dc
spelling ndltd-TW-097KUAS84420972017-06-07T04:36:54Z http://ndltd.ncl.edu.tw/handle/84044613221202444916 Lighting Simulation and Analysis for 69kV Transmission Line with Coupling Ground Wire 69kV輸電線路裝設耦合地線之雷擊特性模擬與分析 Wu-Chang Chen 陳武昌 碩士 國立高雄應用科技大學 電機工程系 97 69kV transmission line due to lightning and line voltage dip caused by the accident beyond. To reduce the occurrence of mine-affected, although Taipower positive measures to improve the implementation of mine hard to achieve a reasonable improvement targets. From 1993 to 2007 to choose off mine, high-density wiring eight regional ground-coupled, after 14 years at the scene to assess the effectiveness of anti-lightning. By statistical coupling in the ground not to install a total of 91 times before the lightning strike accident, after the installation of ground-coupled to 20 times, reduce accidents is about 82% of lightning strikes. Apparent coupling ground mining methods can also be installed to improve the level of mine-resistant, and less investment costs, the effect of good results from the actual installation. Studies in this paper refer to IEEE std. 1243-1997 of the framework to Taipower 69kV to Pingtung Dapeng # 44 to # 50 tower tower of the second interval to the target line. Tower for a total of two of the tower height, type, span and earth guide specifications, as well as the source of lightning surge, the system power supply, tower, transmission lines, such as the establishment of ground-coupled transient model. Through the ATP-EMTP simulation results and the actual installation of mutual authentication in order to explore the installation of the coupling to the line with model number and the effectiveness of lightning protection measures. The results obtained can be used as Taipower to strengthen the economic point of view to assess the effectiveness of lightning protection measures of reference, and improving the quality of electricity supply, as well as the development of China's industries have a lot of help. Ming-Yuan Cho 卓明遠 2009 學位論文 ; thesis 128 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄應用科技大學 === 電機工程系 === 97 === 69kV transmission line due to lightning and line voltage dip caused by the accident beyond. To reduce the occurrence of mine-affected, although Taipower positive measures to improve the implementation of mine hard to achieve a reasonable improvement targets. From 1993 to 2007 to choose off mine, high-density wiring eight regional ground-coupled, after 14 years at the scene to assess the effectiveness of anti-lightning. By statistical coupling in the ground not to install a total of 91 times before the lightning strike accident, after the installation of ground-coupled to 20 times, reduce accidents is about 82% of lightning strikes. Apparent coupling ground mining methods can also be installed to improve the level of mine-resistant, and less investment costs, the effect of good results from the actual installation. Studies in this paper refer to IEEE std. 1243-1997 of the framework to Taipower 69kV to Pingtung Dapeng # 44 to # 50 tower tower of the second interval to the target line. Tower for a total of two of the tower height, type, span and earth guide specifications, as well as the source of lightning surge, the system power supply, tower, transmission lines, such as the establishment of ground-coupled transient model. Through the ATP-EMTP simulation results and the actual installation of mutual authentication in order to explore the installation of the coupling to the line with model number and the effectiveness of lightning protection measures. The results obtained can be used as Taipower to strengthen the economic point of view to assess the effectiveness of lightning protection measures of reference, and improving the quality of electricity supply, as well as the development of China's industries have a lot of help.
author2 Ming-Yuan Cho
author_facet Ming-Yuan Cho
Wu-Chang Chen
陳武昌
author Wu-Chang Chen
陳武昌
spellingShingle Wu-Chang Chen
陳武昌
Lighting Simulation and Analysis for 69kV Transmission Line with Coupling Ground Wire
author_sort Wu-Chang Chen
title Lighting Simulation and Analysis for 69kV Transmission Line with Coupling Ground Wire
title_short Lighting Simulation and Analysis for 69kV Transmission Line with Coupling Ground Wire
title_full Lighting Simulation and Analysis for 69kV Transmission Line with Coupling Ground Wire
title_fullStr Lighting Simulation and Analysis for 69kV Transmission Line with Coupling Ground Wire
title_full_unstemmed Lighting Simulation and Analysis for 69kV Transmission Line with Coupling Ground Wire
title_sort lighting simulation and analysis for 69kv transmission line with coupling ground wire
publishDate 2009
url http://ndltd.ncl.edu.tw/handle/84044613221202444916
work_keys_str_mv AT wuchangchen lightingsimulationandanalysisfor69kvtransmissionlinewithcouplinggroundwire
AT chénwǔchāng lightingsimulationandanalysisfor69kvtransmissionlinewithcouplinggroundwire
AT wuchangchen 69kvshūdiànxiànlùzhuāngshèǒuhédexiànzhīléijītèxìngmónǐyǔfēnxī
AT chénwǔchāng 69kvshūdiànxiànlùzhuāngshèǒuhédexiànzhīléijītèxìngmónǐyǔfēnxī
_version_ 1718456392013053952