A Simulation Analysis on Flow Time Considered the Postponement Decisions of Product Process
碩士 === 國立高雄應用科技大學 === 工業工程與管理系 === 97 === Modern enterprises face with the challenges of the shorten product life cycle. It is an important issue for the enterprises to respond to customer needs quickly. In recent years, many companies use the concept of production postponement to redesign the produ...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/67201468086690145810 |
id |
ndltd-TW-097KUAS8041040 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-097KUAS80410402017-05-26T04:40:25Z http://ndltd.ncl.edu.tw/handle/67201468086690145810 A Simulation Analysis on Flow Time Considered the Postponement Decisions of Product Process 製程延遲決策對訂單流程時間影響之模擬分析 Cheng-Min Lin 林晟民 碩士 國立高雄應用科技大學 工業工程與管理系 97 Modern enterprises face with the challenges of the shorten product life cycle. It is an important issue for the enterprises to respond to customer needs quickly. In recent years, many companies use the concept of production postponement to redesign the products and manufacturing processes to delay the point of product differentiation and overcome the above-mentioned difficulties. In this study, the simulation model of process postponement decision-making system is built, and a simulation experiment design and data analysis are executed. Finally against the average flow time for the ordering process performance indicators, the impact factors of order flow time in the postponement model are identified and discussed. Shan-Yau Wu 吳杉堯 2009 學位論文 ; thesis 65 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立高雄應用科技大學 === 工業工程與管理系 === 97 === Modern enterprises face with the challenges of the shorten product life cycle. It is an important issue for the enterprises to respond to customer needs quickly. In recent years, many companies use the concept of production postponement to redesign the products and manufacturing processes to delay the point of product differentiation and overcome the above-mentioned difficulties. In this study, the simulation model of process postponement decision-making system is built, and a simulation experiment design and data analysis are executed. Finally against the average flow time for the ordering process performance indicators, the impact factors of order flow time in the postponement model are identified and discussed.
|
author2 |
Shan-Yau Wu |
author_facet |
Shan-Yau Wu Cheng-Min Lin 林晟民 |
author |
Cheng-Min Lin 林晟民 |
spellingShingle |
Cheng-Min Lin 林晟民 A Simulation Analysis on Flow Time Considered the Postponement Decisions of Product Process |
author_sort |
Cheng-Min Lin |
title |
A Simulation Analysis on Flow Time Considered the Postponement Decisions of Product Process |
title_short |
A Simulation Analysis on Flow Time Considered the Postponement Decisions of Product Process |
title_full |
A Simulation Analysis on Flow Time Considered the Postponement Decisions of Product Process |
title_fullStr |
A Simulation Analysis on Flow Time Considered the Postponement Decisions of Product Process |
title_full_unstemmed |
A Simulation Analysis on Flow Time Considered the Postponement Decisions of Product Process |
title_sort |
simulation analysis on flow time considered the postponement decisions of product process |
publishDate |
2009 |
url |
http://ndltd.ncl.edu.tw/handle/67201468086690145810 |
work_keys_str_mv |
AT chengminlin asimulationanalysisonflowtimeconsideredthepostponementdecisionsofproductprocess AT línchéngmín asimulationanalysisonflowtimeconsideredthepostponementdecisionsofproductprocess AT chengminlin zhìchéngyánchíjuécèduìdìngdānliúchéngshíjiānyǐngxiǎngzhīmónǐfēnxī AT línchéngmín zhìchéngyánchíjuécèduìdìngdānliúchéngshíjiānyǐngxiǎngzhīmónǐfēnxī AT chengminlin simulationanalysisonflowtimeconsideredthepostponementdecisionsofproductprocess AT línchéngmín simulationanalysisonflowtimeconsideredthepostponementdecisionsofproductprocess |
_version_ |
1718453353428549632 |