Improving On Time Delivery in a Shifting Bottleneck Production Line-A Pre-recorded Disk Production Example
碩士 === 華梵大學 === 工業工程與經營資訊學系碩士班 === 97 === The seasonality factor has strong impact to the market demand of the pre-recorded CD industry. The transition between seasons creates a significant difference in demand pattern that in term causes the bottleneck floating between workstations, an inevitable s...
Main Authors: | Yen-Chang Lu, 呂彥樟 |
---|---|
Other Authors: | Jy-Hsin Lin |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/53071401140748007376 |
Similar Items
-
Scheduling a Fully-Loaded Production Line-A Pre-recorded Disk Production Example
by: Su-Ling Lin, et al.
Published: (2006) -
Automation line bottleneck shifting analysis
by: Jui-Ying Huang, et al. -
The Study of Extracting Purchase Order Strategies-A Pre-recorded disk production example
by: Hui-Lung Wei, et al.
Published: (2006) -
Simulating and Improving the ProductionResources of Bottleneck~ taking STN-LCD production line as an example
by: Kuo-Ping Chen, et al.
Published: (2004) -
Bottleneck shifting in production lines: Impact of variability, new detection method and control strategies
by: Tamilselvan, Prasannavenkatesh
Published: (2011)