Applying Fuzzy Linear Programming to Project Scheduling Problem:An Example of Conveyor Equipment Manufacturing

碩士 === 佛光大學 === 管理學系 === 97 === According to the increasing complexity of the conveyor equipment manufacturing and also the diversity of division of labor, using the conventional managing method is not sufficient and efficient anymore. To date, the project programming depends heavily on the experien...

Full description

Bibliographic Details
Main Author: 簡松樹
Other Authors: 陳志賢
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/49951205728617685183
id ndltd-TW-097FGU05583024
record_format oai_dc
spelling ndltd-TW-097FGU055830242017-03-12T04:13:24Z http://ndltd.ncl.edu.tw/handle/49951205728617685183 Applying Fuzzy Linear Programming to Project Scheduling Problem:An Example of Conveyor Equipment Manufacturing 應用模糊線性規劃於專案排程之研究─以輸送設備製造為例 簡松樹 碩士 佛光大學 管理學系 97 According to the increasing complexity of the conveyor equipment manufacturing and also the diversity of division of labor, using the conventional managing method is not sufficient and efficient anymore. To date, the project programming depends heavily on the experience of senior mechanics which is not systematic and scientific enough to approach the lowest cost and highest efficiency on project programming. In terms of conveyor equipment manufacturing, developing a way to finish the project as soon as possible is a important task for managers. Therefore, here, we develop a way for manufacturing to solve the project scheduling problem. We propose two ways to solve the problem: First, we estimate five different kinds of manufacturing period using fuzzy theory and establish the mathematics models using linear programming (LP). Second, on the basis of the manufacturing uncertainty, we try to look for the way to approach lowest cost and highest efficiency using degrees of Membership. Our study provides a way for people to investigate the role of fuzzy manufacturing method on projects. Also, we simplify the complexity of project programming and help people finish the project with most efficient way. Here we use the software of LINGO as a tool to study the fuzzy theory on linear programming. Moreover, we simulate our formulation side by side with the real case, therefore, the formulation will become more realistic. 陳志賢 2009 學位論文 ; thesis zh-TW
collection NDLTD
language zh-TW
sources NDLTD
description 碩士 === 佛光大學 === 管理學系 === 97 === According to the increasing complexity of the conveyor equipment manufacturing and also the diversity of division of labor, using the conventional managing method is not sufficient and efficient anymore. To date, the project programming depends heavily on the experience of senior mechanics which is not systematic and scientific enough to approach the lowest cost and highest efficiency on project programming. In terms of conveyor equipment manufacturing, developing a way to finish the project as soon as possible is a important task for managers. Therefore, here, we develop a way for manufacturing to solve the project scheduling problem. We propose two ways to solve the problem: First, we estimate five different kinds of manufacturing period using fuzzy theory and establish the mathematics models using linear programming (LP). Second, on the basis of the manufacturing uncertainty, we try to look for the way to approach lowest cost and highest efficiency using degrees of Membership. Our study provides a way for people to investigate the role of fuzzy manufacturing method on projects. Also, we simplify the complexity of project programming and help people finish the project with most efficient way. Here we use the software of LINGO as a tool to study the fuzzy theory on linear programming. Moreover, we simulate our formulation side by side with the real case, therefore, the formulation will become more realistic.
author2 陳志賢
author_facet 陳志賢
簡松樹
author 簡松樹
spellingShingle 簡松樹
Applying Fuzzy Linear Programming to Project Scheduling Problem:An Example of Conveyor Equipment Manufacturing
author_sort 簡松樹
title Applying Fuzzy Linear Programming to Project Scheduling Problem:An Example of Conveyor Equipment Manufacturing
title_short Applying Fuzzy Linear Programming to Project Scheduling Problem:An Example of Conveyor Equipment Manufacturing
title_full Applying Fuzzy Linear Programming to Project Scheduling Problem:An Example of Conveyor Equipment Manufacturing
title_fullStr Applying Fuzzy Linear Programming to Project Scheduling Problem:An Example of Conveyor Equipment Manufacturing
title_full_unstemmed Applying Fuzzy Linear Programming to Project Scheduling Problem:An Example of Conveyor Equipment Manufacturing
title_sort applying fuzzy linear programming to project scheduling problem:an example of conveyor equipment manufacturing
publishDate 2009
url http://ndltd.ncl.edu.tw/handle/49951205728617685183
work_keys_str_mv AT jiǎnsōngshù applyingfuzzylinearprogrammingtoprojectschedulingproblemanexampleofconveyorequipmentmanufacturing
AT jiǎnsōngshù yīngyòngmóhúxiànxìngguīhuàyúzhuānànpáichéngzhīyánjiūyǐshūsòngshèbèizhìzàowèilì
_version_ 1718420929424392192