A linear deteriorating scheduling problem with blocking on a two-machine flowshop
碩士 === 逢甲大學 === 統計與精算所 === 97 === This paper investigates a situation in manufacture environment where the job time isn’t a fixed value. That is, the job time becomes long as the waiting time passes, and the scheduling without buffer equipment cause blocking phenomenon. Making the manufacturing time...
Main Authors: | Shiuan-Kang Chen, 陳玄康 |
---|---|
Other Authors: | Chin-Chia Wu |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/22282432565157601403 |
Similar Items
-
Reentrant permutation flowshop scheduling with a deteriorating schedule
by: Makgoba, Matsebe Juliet
Published: (2021) -
Flowshop Scheduling Problems with Blocking Constraint
by: Wen-Hsuan Fang, et al. -
The problem of bicriteria scheduling in a two-machine flowshop
by: ZHOU, CHONG-BIN, et al.
Published: (1993) -
Some Generalized Two-Machine Flowshop Scheduling Problem
by: Dar-Li Yang, et al.
Published: (1994) -
A two-agent scheduling problem in a two-machine flowshop
by: Mohammad-Hasan Ahmadi-Darani, et al.
Published: (2018-10-01)