Analysis of Deep Excavation in CR2 Project Stations of KMRT
碩士 === 正修科技大學 === 營建工程研究所 === 97 === This thesis presents a case study of deep excavation for the CR2 turnkey project construction includ R4A,R5,R6 station in Kaohsiung Mass Rapid Transit System (KMRT). This study discusses the displacement of diaphragm wall, the ground responses and the settlement...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/16065532801819314921 |
id |
ndltd-TW-097CSU00582014 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-097CSU005820142017-04-27T04:23:47Z http://ndltd.ncl.edu.tw/handle/16065532801819314921 Analysis of Deep Excavation in CR2 Project Stations of KMRT 高雄捷運CR2區段標主站體開挖行為之分析研究 CHENG, CHUAN-PING 鄭全斌 碩士 正修科技大學 營建工程研究所 97 This thesis presents a case study of deep excavation for the CR2 turnkey project construction includ R4A,R5,R6 station in Kaohsiung Mass Rapid Transit System (KMRT). This study discusses the displacement of diaphragm wall, the ground responses and the settlement of buildings nearby the excavation site. The analysis result showed that the characteristic of CR2 deep excavation to tally approximately with f0rmer’s study. In which, the ratio of the penetration depth D of diaphragm wall and the deep excavation depth H is between 0.73 and 0.80, the ratio of wall thickness t and the deep excavation depth H is between 4.51﹪ and 5.28 ﹪, the ratio of wall length L and the deep excavation depth H is between 1.73 and 1.8. Moreover, the ratio of maximum wall displacement δhmax and the deep excavation depth H is between 0.21% and 0.30%, the ratio of maximum ground settlement δvmax and the deep excavation depth H is between 0.07% and 0.26%,and the value of δvmax over δhmax is between 0.35 and 0.88. The above empirical formulas can be used for design and analysis purpose in relative region for Red and Orange Line of Kaohsiung MRT . 王建智 2009 學位論文 ; thesis 162 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 正修科技大學 === 營建工程研究所 === 97 === This thesis presents a case study of deep excavation for the CR2 turnkey project construction includ R4A,R5,R6 station in Kaohsiung Mass Rapid Transit System (KMRT). This study discusses the displacement of diaphragm wall, the ground responses and the settlement of buildings nearby the excavation site. The analysis result showed that the characteristic of CR2 deep excavation to tally approximately with f0rmer’s study. In which, the ratio of the penetration depth D of diaphragm wall and the deep excavation depth H is between 0.73 and 0.80, the ratio of wall thickness t and the deep excavation depth H is between 4.51﹪ and 5.28 ﹪, the ratio of wall length L and the deep excavation depth H is between 1.73 and 1.8. Moreover, the ratio of maximum wall displacement δhmax and the deep excavation depth H is between 0.21% and 0.30%, the ratio of maximum ground settlement δvmax and the deep excavation depth H is between 0.07% and 0.26%,and the value of δvmax over δhmax is between 0.35 and 0.88. The above empirical formulas can be used for design and analysis purpose in relative region for Red and Orange Line of Kaohsiung MRT .
|
author2 |
王建智 |
author_facet |
王建智 CHENG, CHUAN-PING 鄭全斌 |
author |
CHENG, CHUAN-PING 鄭全斌 |
spellingShingle |
CHENG, CHUAN-PING 鄭全斌 Analysis of Deep Excavation in CR2 Project Stations of KMRT |
author_sort |
CHENG, CHUAN-PING |
title |
Analysis of Deep Excavation in CR2 Project Stations of KMRT |
title_short |
Analysis of Deep Excavation in CR2 Project Stations of KMRT |
title_full |
Analysis of Deep Excavation in CR2 Project Stations of KMRT |
title_fullStr |
Analysis of Deep Excavation in CR2 Project Stations of KMRT |
title_full_unstemmed |
Analysis of Deep Excavation in CR2 Project Stations of KMRT |
title_sort |
analysis of deep excavation in cr2 project stations of kmrt |
publishDate |
2009 |
url |
http://ndltd.ncl.edu.tw/handle/16065532801819314921 |
work_keys_str_mv |
AT chengchuanping analysisofdeepexcavationincr2projectstationsofkmrt AT zhèngquánbīn analysisofdeepexcavationincr2projectstationsofkmrt AT chengchuanping gāoxióngjiéyùncr2qūduànbiāozhǔzhàntǐkāiwāxíngwèizhīfēnxīyánjiū AT zhèngquánbīn gāoxióngjiéyùncr2qūduànbiāozhǔzhàntǐkāiwāxíngwèizhīfēnxīyánjiū |
_version_ |
1718444383241502720 |