失誤樹分析法於交通工程執行進度落後預測之應用性探討
碩士 === 中華大學 === 土木與工程資訊學系(所) === 97 === Due to numerous factors contained within traffic engineering, the schedule is often delayed. The character of factors need to discuss. This research adopted the weighting and ranking of 45 major effect factors by FAHP. According to four kinds of fault tree ana...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/94722895554936928312 |
id |
ndltd-TW-097CHPI5015014 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-097CHPI50150142015-11-13T04:09:14Z http://ndltd.ncl.edu.tw/handle/94722895554936928312 失誤樹分析法於交通工程執行進度落後預測之應用性探討 Wei, Wen-Ssu 魏文思 碩士 中華大學 土木與工程資訊學系(所) 97 Due to numerous factors contained within traffic engineering, the schedule is often delayed. The character of factors need to discuss. This research adopted the weighting and ranking of 45 major effect factors by FAHP. According to four kinds of fault tree analysis to calculate the percentage behind schedule and the importance of 36 mutual major effect factors from the sponsor institution, design jail unit and contractor. The main outcomes in this study include: (1) the assessed value of behind schedule is 0.2410, the predictive value of behind schedule is 0.1286~0.2150. (2) basically, when certain effect factors be set to “AND gate” , the effect factors will be sorted to the end of ranking, the relative ranking is according to the size of fault rate. Yang, Chao-Ping 楊朝平 2009 學位論文 ; thesis 100 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 中華大學 === 土木與工程資訊學系(所) === 97 === Due to numerous factors contained within traffic engineering, the schedule is often delayed. The character of factors need to discuss. This research adopted the weighting and ranking of 45 major effect factors by FAHP. According to four kinds of fault tree analysis to calculate the percentage behind schedule and the importance of 36 mutual major effect factors from the sponsor institution, design jail unit and contractor. The main outcomes in this study include: (1) the assessed value of behind schedule is 0.2410, the predictive value of behind schedule is 0.1286~0.2150. (2) basically, when certain effect factors be set to “AND gate” , the effect factors will be sorted to the end of ranking, the relative ranking is according to the size of fault rate.
|
author2 |
Yang, Chao-Ping |
author_facet |
Yang, Chao-Ping Wei, Wen-Ssu 魏文思 |
author |
Wei, Wen-Ssu 魏文思 |
spellingShingle |
Wei, Wen-Ssu 魏文思 失誤樹分析法於交通工程執行進度落後預測之應用性探討 |
author_sort |
Wei, Wen-Ssu |
title |
失誤樹分析法於交通工程執行進度落後預測之應用性探討 |
title_short |
失誤樹分析法於交通工程執行進度落後預測之應用性探討 |
title_full |
失誤樹分析法於交通工程執行進度落後預測之應用性探討 |
title_fullStr |
失誤樹分析法於交通工程執行進度落後預測之應用性探討 |
title_full_unstemmed |
失誤樹分析法於交通工程執行進度落後預測之應用性探討 |
title_sort |
失誤樹分析法於交通工程執行進度落後預測之應用性探討 |
publishDate |
2009 |
url |
http://ndltd.ncl.edu.tw/handle/94722895554936928312 |
work_keys_str_mv |
AT weiwenssu shīwùshùfēnxīfǎyújiāotōnggōngchéngzhíxíngjìndùluòhòuyùcèzhīyīngyòngxìngtàntǎo AT wèiwénsī shīwùshùfēnxīfǎyújiāotōnggōngchéngzhíxíngjìndùluòhòuyùcèzhīyīngyòngxìngtàntǎo |
_version_ |
1718128823606706176 |