Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem

碩士 === 元智大學 === 工業工程與管理學系 === 96 === The thesis explores a decision problem on selecting the best alternative among various maintenance schedules for four types of military equipments that are currently in use. The problem under study involves two multi-criteria decision making issues: Selecting the...

Full description

Bibliographic Details
Main Authors: Chun-Ming Ho, 何俊明
Other Authors: Chiuh-Cheng Chyu
Format: Others
Language:zh-TW
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/88751893369859481463
id ndltd-TW-096YZU05031018
record_format oai_dc
spelling ndltd-TW-096YZU050310182015-10-13T13:48:20Z http://ndltd.ncl.edu.tw/handle/88751893369859481463 Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem 多專案維修作業排程結合多目標決策之研究 Chun-Ming Ho 何俊明 碩士 元智大學 工業工程與管理學系 96 The thesis explores a decision problem on selecting the best alternative among various maintenance schedules for four types of military equipments that are currently in use. The problem under study involves two multi-criteria decision making issues: Selecting the best schedule (1) that maintains and repairs simultaneously four different types of equipments and (2) that maximizes the productivity of the maintenance working centers within a whole year. The research results will provide a valuable reference for the relevant management to make good decisions. The problem solving approach to the first issue consists of fives phases: (1) Determine the objectives that the management is concerned with; (2) Construct multi-objective linear integer models for the problem; (3) Collect relevant data from the working centers; (4) Find a set of Pareto optimal solutions by employing LINGO optimizer to the models; (5) Provide the best alternatives to the management based on their concerns. A simulated annealing algorithm is developed to solve the second issue; i.e., to find the maximum maintenance capability of the working centers within one year. The alternatives under consideration have a makespan between 360 and 365 days. Similar to the first issue, a limited number of alternatives, as well as the analysis of benefits and losses, are provided to help the management make a good decision. Additionally, a sensitivity analysis is performed on a particular and important working center in the situation where one additional unit of such center is constructed. A detailed discussion and decision making based on the sensitivity numerical results are included in the thesis. Chiuh-Cheng Chyu 徐旭昇 2008 學位論文 ; thesis 76 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 元智大學 === 工業工程與管理學系 === 96 === The thesis explores a decision problem on selecting the best alternative among various maintenance schedules for four types of military equipments that are currently in use. The problem under study involves two multi-criteria decision making issues: Selecting the best schedule (1) that maintains and repairs simultaneously four different types of equipments and (2) that maximizes the productivity of the maintenance working centers within a whole year. The research results will provide a valuable reference for the relevant management to make good decisions. The problem solving approach to the first issue consists of fives phases: (1) Determine the objectives that the management is concerned with; (2) Construct multi-objective linear integer models for the problem; (3) Collect relevant data from the working centers; (4) Find a set of Pareto optimal solutions by employing LINGO optimizer to the models; (5) Provide the best alternatives to the management based on their concerns. A simulated annealing algorithm is developed to solve the second issue; i.e., to find the maximum maintenance capability of the working centers within one year. The alternatives under consideration have a makespan between 360 and 365 days. Similar to the first issue, a limited number of alternatives, as well as the analysis of benefits and losses, are provided to help the management make a good decision. Additionally, a sensitivity analysis is performed on a particular and important working center in the situation where one additional unit of such center is constructed. A detailed discussion and decision making based on the sensitivity numerical results are included in the thesis.
author2 Chiuh-Cheng Chyu
author_facet Chiuh-Cheng Chyu
Chun-Ming Ho
何俊明
author Chun-Ming Ho
何俊明
spellingShingle Chun-Ming Ho
何俊明
Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem
author_sort Chun-Ming Ho
title Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem
title_short Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem
title_full Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem
title_fullStr Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem
title_full_unstemmed Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem
title_sort project scheduling and multi-criteria decision making on a multiple equipment maintenance problem
publishDate 2008
url http://ndltd.ncl.edu.tw/handle/88751893369859481463
work_keys_str_mv AT chunmingho projectschedulingandmulticriteriadecisionmakingonamultipleequipmentmaintenanceproblem
AT héjùnmíng projectschedulingandmulticriteriadecisionmakingonamultipleequipmentmaintenanceproblem
AT chunmingho duōzhuānànwéixiūzuòyèpáichéngjiéhéduōmùbiāojuécèzhīyánjiū
AT héjùnmíng duōzhuānànwéixiūzuòyèpáichéngjiéhéduōmùbiāojuécèzhīyánjiū
_version_ 1717743904703381504