Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem
碩士 === 元智大學 === 工業工程與管理學系 === 96 === The thesis explores a decision problem on selecting the best alternative among various maintenance schedules for four types of military equipments that are currently in use. The problem under study involves two multi-criteria decision making issues: Selecting the...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/88751893369859481463 |
id |
ndltd-TW-096YZU05031018 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-096YZU050310182015-10-13T13:48:20Z http://ndltd.ncl.edu.tw/handle/88751893369859481463 Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem 多專案維修作業排程結合多目標決策之研究 Chun-Ming Ho 何俊明 碩士 元智大學 工業工程與管理學系 96 The thesis explores a decision problem on selecting the best alternative among various maintenance schedules for four types of military equipments that are currently in use. The problem under study involves two multi-criteria decision making issues: Selecting the best schedule (1) that maintains and repairs simultaneously four different types of equipments and (2) that maximizes the productivity of the maintenance working centers within a whole year. The research results will provide a valuable reference for the relevant management to make good decisions. The problem solving approach to the first issue consists of fives phases: (1) Determine the objectives that the management is concerned with; (2) Construct multi-objective linear integer models for the problem; (3) Collect relevant data from the working centers; (4) Find a set of Pareto optimal solutions by employing LINGO optimizer to the models; (5) Provide the best alternatives to the management based on their concerns. A simulated annealing algorithm is developed to solve the second issue; i.e., to find the maximum maintenance capability of the working centers within one year. The alternatives under consideration have a makespan between 360 and 365 days. Similar to the first issue, a limited number of alternatives, as well as the analysis of benefits and losses, are provided to help the management make a good decision. Additionally, a sensitivity analysis is performed on a particular and important working center in the situation where one additional unit of such center is constructed. A detailed discussion and decision making based on the sensitivity numerical results are included in the thesis. Chiuh-Cheng Chyu 徐旭昇 2008 學位論文 ; thesis 76 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 元智大學 === 工業工程與管理學系 === 96 === The thesis explores a decision problem on selecting the best alternative among various maintenance schedules for four types of military equipments that are currently in use. The problem under study involves two multi-criteria decision making issues: Selecting the best schedule (1) that maintains and repairs simultaneously four different types of equipments and (2) that maximizes the productivity of the maintenance working centers within a whole year. The research results will provide a valuable reference for the relevant management to make good decisions.
The problem solving approach to the first issue consists of fives phases: (1) Determine the objectives that the management is concerned with; (2) Construct multi-objective linear integer models for the problem; (3) Collect relevant data from the working centers; (4) Find a set of Pareto optimal solutions by employing LINGO optimizer to the models; (5) Provide the best alternatives to the management based on their concerns.
A simulated annealing algorithm is developed to solve the second issue; i.e., to find the maximum maintenance capability of the working centers within one year. The alternatives under consideration have a makespan between 360 and 365 days. Similar to the first issue, a limited number of alternatives, as well as the analysis of benefits and losses, are provided to help the management make a good decision. Additionally, a sensitivity analysis is performed on a particular and important working center in the situation where one additional unit of such center is constructed. A detailed discussion and decision making based on the sensitivity numerical results are included in the thesis.
|
author2 |
Chiuh-Cheng Chyu |
author_facet |
Chiuh-Cheng Chyu Chun-Ming Ho 何俊明 |
author |
Chun-Ming Ho 何俊明 |
spellingShingle |
Chun-Ming Ho 何俊明 Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem |
author_sort |
Chun-Ming Ho |
title |
Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem |
title_short |
Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem |
title_full |
Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem |
title_fullStr |
Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem |
title_full_unstemmed |
Project Scheduling and Multi-criteria Decision Making on a Multiple Equipment Maintenance Problem |
title_sort |
project scheduling and multi-criteria decision making on a multiple equipment maintenance problem |
publishDate |
2008 |
url |
http://ndltd.ncl.edu.tw/handle/88751893369859481463 |
work_keys_str_mv |
AT chunmingho projectschedulingandmulticriteriadecisionmakingonamultipleequipmentmaintenanceproblem AT héjùnmíng projectschedulingandmulticriteriadecisionmakingonamultipleequipmentmaintenanceproblem AT chunmingho duōzhuānànwéixiūzuòyèpáichéngjiéhéduōmùbiāojuécèzhīyánjiū AT héjùnmíng duōzhuānànwéixiūzuòyèpáichéngjiéhéduōmùbiāojuécèzhīyánjiū |
_version_ |
1717743904703381504 |