An Integrated Inventory Model with Present Value and Dependent Crashing Cost is Polynomial under the Imperfect Production Process in the Supply Chain
碩士 === 國立臺北科技大學 === 工業工程與管理研究所 === 96 === Due to increasing challenges and changing demand in today’s highly competitive global supply chain environment, reducing lead time and the associated inventory cost are the most important issues in the supply chain. In most of the past studies, they do not c...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/pd85h6 |
id |
ndltd-TW-096TIT05031034 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-096TIT050310342019-08-01T03:45:30Z http://ndltd.ncl.edu.tw/handle/pd85h6 An Integrated Inventory Model with Present Value and Dependent Crashing Cost is Polynomial under the Imperfect Production Process in the Supply Chain 供應鏈中品質不可靠環境下考慮現值且趕工成本為多項式函數之整合存貨模型 Mei-Hsin Lin 林玫欣 碩士 國立臺北科技大學 工業工程與管理研究所 96 Due to increasing challenges and changing demand in today’s highly competitive global supply chain environment, reducing lead time and the associated inventory cost are the most important issues in the supply chain. In most of the past studies, they do not consider with time value. However, the effect of inflation is too critical to ignore. So we considered time value and develop an improved integrated inventory model with imperfect quality items and variable lead time crashing cost which determined by the length of lead time is polynomial. It aims at shortening the lead time so as to reduce the present value of integrated inventory joint expected total cost over infinite time horizon. The goal of this paper is to derive simultaneously the optimal order quantity, the length of lead time, process quality and the number of lots which are delivered from the vender to the buyer. Finally, an algorithm procedure of finding the optimal solution is developed, and some numerical examples are given to illustrate results. 邱垂昱 2008 學位論文 ; thesis 44 en_US |
collection |
NDLTD |
language |
en_US |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺北科技大學 === 工業工程與管理研究所 === 96 === Due to increasing challenges and changing demand in today’s highly competitive global supply chain environment, reducing lead time and the associated inventory cost are the most important issues in the supply chain. In most of the past studies, they do not consider with time value. However, the effect of inflation is too critical to ignore. So we considered time value and develop an improved integrated inventory model with imperfect quality items and variable lead time crashing cost which determined by the length of lead time is polynomial. It aims at shortening the lead time so as to reduce the present value of integrated inventory joint expected total cost over infinite time horizon. The goal of this paper is to derive simultaneously the optimal order quantity, the length of lead time, process quality and the number of lots which are delivered from the vender to the buyer. Finally, an algorithm procedure of finding the optimal solution is developed, and some numerical examples are given to illustrate results.
|
author2 |
邱垂昱 |
author_facet |
邱垂昱 Mei-Hsin Lin 林玫欣 |
author |
Mei-Hsin Lin 林玫欣 |
spellingShingle |
Mei-Hsin Lin 林玫欣 An Integrated Inventory Model with Present Value and Dependent Crashing Cost is Polynomial under the Imperfect Production Process in the Supply Chain |
author_sort |
Mei-Hsin Lin |
title |
An Integrated Inventory Model with Present Value and Dependent Crashing Cost is Polynomial under the Imperfect Production Process in the Supply Chain |
title_short |
An Integrated Inventory Model with Present Value and Dependent Crashing Cost is Polynomial under the Imperfect Production Process in the Supply Chain |
title_full |
An Integrated Inventory Model with Present Value and Dependent Crashing Cost is Polynomial under the Imperfect Production Process in the Supply Chain |
title_fullStr |
An Integrated Inventory Model with Present Value and Dependent Crashing Cost is Polynomial under the Imperfect Production Process in the Supply Chain |
title_full_unstemmed |
An Integrated Inventory Model with Present Value and Dependent Crashing Cost is Polynomial under the Imperfect Production Process in the Supply Chain |
title_sort |
integrated inventory model with present value and dependent crashing cost is polynomial under the imperfect production process in the supply chain |
publishDate |
2008 |
url |
http://ndltd.ncl.edu.tw/handle/pd85h6 |
work_keys_str_mv |
AT meihsinlin anintegratedinventorymodelwithpresentvalueanddependentcrashingcostispolynomialundertheimperfectproductionprocessinthesupplychain AT línméixīn anintegratedinventorymodelwithpresentvalueanddependentcrashingcostispolynomialundertheimperfectproductionprocessinthesupplychain AT meihsinlin gōngyīngliànzhōngpǐnzhìbùkěkàohuánjìngxiàkǎolǜxiànzhíqiěgǎngōngchéngběnwèiduōxiàngshìhánshùzhīzhěnghécúnhuòmóxíng AT línméixīn gōngyīngliànzhōngpǐnzhìbùkěkàohuánjìngxiàkǎolǜxiànzhíqiěgǎngōngchéngběnwèiduōxiàngshìhánshùzhīzhěnghécúnhuòmóxíng AT meihsinlin integratedinventorymodelwithpresentvalueanddependentcrashingcostispolynomialundertheimperfectproductionprocessinthesupplychain AT línméixīn integratedinventorymodelwithpresentvalueanddependentcrashingcostispolynomialundertheimperfectproductionprocessinthesupplychain |
_version_ |
1719231768480972800 |