Multi-site Production Planning Model for Memory Module Industry

碩士 === 東海大學 === 工業工程與經營資訊學系 === 96 === The memory module industry is locates in the middle of the chain of memory industry, the processes of memory module is assemble several components with surface-mount technology on the print circuit board. This industry have long lead time to obtain the key mate...

Full description

Bibliographic Details
Main Authors: Cheng-Ying Wu, 吳政穎
Other Authors: Li-Chih Wang
Format: Others
Language:zh-TW
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/63481823776488131412
id ndltd-TW-096THU00030029
record_format oai_dc
spelling ndltd-TW-096THU000300292015-11-30T04:02:33Z http://ndltd.ncl.edu.tw/handle/63481823776488131412 Multi-site Production Planning Model for Memory Module Industry 記憶體模組產業之多廠區生產規劃模式 Cheng-Ying Wu 吳政穎 碩士 東海大學 工業工程與經營資訊學系 96 The memory module industry is locates in the middle of the chain of memory industry, the processes of memory module is assemble several components with surface-mount technology on the print circuit board. This industry have long lead time to obtain the key material chip that produced from wafer fabrication factories with approximate 3 months and highly BOM alternative. Hence, the memory module industry must allocate the limit of supply to fulfill customer's demands effectively. Besides, the multi-site production environment has more challenges than single-site, this research proposed a linear program model with the constraints such as material, capacity, transportation, material support between production sites, and the objective of the model is minimize the integrated manufacturing costs and employed the model with the software ILOG CPLEX. Via experimentation to compare the effectiveness between the mathematical model and the plan method that enterprise does. And also, get the suitable range of the model. Li-Chih Wang 王立志 2008 學位論文 ; thesis 85 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 東海大學 === 工業工程與經營資訊學系 === 96 === The memory module industry is locates in the middle of the chain of memory industry, the processes of memory module is assemble several components with surface-mount technology on the print circuit board. This industry have long lead time to obtain the key material chip that produced from wafer fabrication factories with approximate 3 months and highly BOM alternative. Hence, the memory module industry must allocate the limit of supply to fulfill customer's demands effectively. Besides, the multi-site production environment has more challenges than single-site, this research proposed a linear program model with the constraints such as material, capacity, transportation, material support between production sites, and the objective of the model is minimize the integrated manufacturing costs and employed the model with the software ILOG CPLEX. Via experimentation to compare the effectiveness between the mathematical model and the plan method that enterprise does. And also, get the suitable range of the model.
author2 Li-Chih Wang
author_facet Li-Chih Wang
Cheng-Ying Wu
吳政穎
author Cheng-Ying Wu
吳政穎
spellingShingle Cheng-Ying Wu
吳政穎
Multi-site Production Planning Model for Memory Module Industry
author_sort Cheng-Ying Wu
title Multi-site Production Planning Model for Memory Module Industry
title_short Multi-site Production Planning Model for Memory Module Industry
title_full Multi-site Production Planning Model for Memory Module Industry
title_fullStr Multi-site Production Planning Model for Memory Module Industry
title_full_unstemmed Multi-site Production Planning Model for Memory Module Industry
title_sort multi-site production planning model for memory module industry
publishDate 2008
url http://ndltd.ncl.edu.tw/handle/63481823776488131412
work_keys_str_mv AT chengyingwu multisiteproductionplanningmodelformemorymoduleindustry
AT wúzhèngyǐng multisiteproductionplanningmodelformemorymoduleindustry
AT chengyingwu jìyìtǐmózǔchǎnyèzhīduōchǎngqūshēngchǎnguīhuàmóshì
AT wúzhèngyǐng jìyìtǐmózǔchǎnyèzhīduōchǎngqūshēngchǎnguīhuàmóshì
_version_ 1718139380055408640