Grid-connecting Protective Relay for Distribution Generation System

碩士 === 聖約翰科技大學 === 電機工程系碩士班 === 97 === An integrated islanding detection method for use with grid-connected distributed generator (DG) is proposed in this thesis. The proposed integrated islanding detection method contains passive islanding detection method and active islanding detection method. The...

Full description

Bibliographic Details
Main Authors: Yi-Wen Liao, 廖意文
Other Authors: Wen-Yeau Chang
Format: Others
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/19140990147484453218
id ndltd-TW-096SJSM0442001
record_format oai_dc
spelling ndltd-TW-096SJSM04420012015-11-20T04:18:44Z http://ndltd.ncl.edu.tw/handle/19140990147484453218 Grid-connecting Protective Relay for Distribution Generation System 分散式發電系統之併網保護電驛研製 Yi-Wen Liao 廖意文 碩士 聖約翰科技大學 電機工程系碩士班 97 An integrated islanding detection method for use with grid-connected distributed generator (DG) is proposed in this thesis. The proposed integrated islanding detection method contains passive islanding detection method and active islanding detection method. The passive islanding detection method is based on two indices: the rate of change of frequency (ROCOF) and rate of change of voltage (ROCOV). The detection system monitors the terminal voltage at the grid-interconnected point, and operates when the value of ROCOF or ROCOV exceeds a setting and duration exceeds a time delay setting. When DG is grid-interconnected, the ROCOF and ROCOV are lower than the threshold values. In contrast, as an islanding occurs, the ROCOF or ROCOV would become much higher than the threshold values. The active islanding detection method is based on correlation factor calculation. The method obtains voltage fluctuation through the high impedance load switching on the grid periodically. The correlation factor between the periodic perturbed signal and the fluctuant voltage is then used as an islanding detection index. When DG is connected to the grid, the correlation factor is lower than a threshold value. In contrast, as an islanding occurs, the correlation factor would become much higher than the threshold value. The proposed integrated islanding detection method monitors the terminal voltage at the grid-interconnected point, and operates when the value of ROCOF or ROCOV exceeds a higher setting and duration exceeds a time delay setting. If the value of ROCOF or ROCOV exceeds a lower setting, the active islanding detection method will started. Then the correlation factor will be calculated to determine the operation state of DG. Experiments are discussed which demonstrate the principles of the technique. Test results are presented which show that the integrated islanding detection method is reliable, economical and easy for implementation. Wen-Yeau Chang 張文宇 2009 學位論文 ; thesis 79 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 聖約翰科技大學 === 電機工程系碩士班 === 97 === An integrated islanding detection method for use with grid-connected distributed generator (DG) is proposed in this thesis. The proposed integrated islanding detection method contains passive islanding detection method and active islanding detection method. The passive islanding detection method is based on two indices: the rate of change of frequency (ROCOF) and rate of change of voltage (ROCOV). The detection system monitors the terminal voltage at the grid-interconnected point, and operates when the value of ROCOF or ROCOV exceeds a setting and duration exceeds a time delay setting. When DG is grid-interconnected, the ROCOF and ROCOV are lower than the threshold values. In contrast, as an islanding occurs, the ROCOF or ROCOV would become much higher than the threshold values. The active islanding detection method is based on correlation factor calculation. The method obtains voltage fluctuation through the high impedance load switching on the grid periodically. The correlation factor between the periodic perturbed signal and the fluctuant voltage is then used as an islanding detection index. When DG is connected to the grid, the correlation factor is lower than a threshold value. In contrast, as an islanding occurs, the correlation factor would become much higher than the threshold value. The proposed integrated islanding detection method monitors the terminal voltage at the grid-interconnected point, and operates when the value of ROCOF or ROCOV exceeds a higher setting and duration exceeds a time delay setting. If the value of ROCOF or ROCOV exceeds a lower setting, the active islanding detection method will started. Then the correlation factor will be calculated to determine the operation state of DG. Experiments are discussed which demonstrate the principles of the technique. Test results are presented which show that the integrated islanding detection method is reliable, economical and easy for implementation.
author2 Wen-Yeau Chang
author_facet Wen-Yeau Chang
Yi-Wen Liao
廖意文
author Yi-Wen Liao
廖意文
spellingShingle Yi-Wen Liao
廖意文
Grid-connecting Protective Relay for Distribution Generation System
author_sort Yi-Wen Liao
title Grid-connecting Protective Relay for Distribution Generation System
title_short Grid-connecting Protective Relay for Distribution Generation System
title_full Grid-connecting Protective Relay for Distribution Generation System
title_fullStr Grid-connecting Protective Relay for Distribution Generation System
title_full_unstemmed Grid-connecting Protective Relay for Distribution Generation System
title_sort grid-connecting protective relay for distribution generation system
publishDate 2009
url http://ndltd.ncl.edu.tw/handle/19140990147484453218
work_keys_str_mv AT yiwenliao gridconnectingprotectiverelayfordistributiongenerationsystem
AT liàoyìwén gridconnectingprotectiverelayfordistributiongenerationsystem
AT yiwenliao fēnsànshìfādiànxìtǒngzhībìngwǎngbǎohùdiànyìyánzhì
AT liàoyìwén fēnsànshìfādiànxìtǒngzhībìngwǎngbǎohùdiànyìyánzhì
_version_ 1718131477815754752