Implementing Early -Warning System for Risk Management on Futures Commission Merchants: Case Studies in Taiwan.

碩士 === 國立臺灣科技大學 === 財務金融研究所 === 96 === This thesis is based on the recommendations of research report entitled ”The adjustments of business risks early-warning system to clearing and non-clearing members of Taiwan Futures Exchange,” conducted by Shen Da Bai, professor at Accountant, Suzhou Universit...

Full description

Bibliographic Details
Main Authors: Chun-ching Huang, 黃春景
Other Authors: none
Format: Others
Language:zh-TW
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/61289660802894214992
id ndltd-TW-096NTUS5304009
record_format oai_dc
spelling ndltd-TW-096NTUS53040092016-05-18T04:13:35Z http://ndltd.ncl.edu.tw/handle/61289660802894214992 Implementing Early -Warning System for Risk Management on Futures Commission Merchants: Case Studies in Taiwan. 期貨商經營風險預警系統--採用6大群組控管執行成效實證及案例探討 Chun-ching Huang 黃春景 碩士 國立臺灣科技大學 財務金融研究所 96 This thesis is based on the recommendations of research report entitled ”The adjustments of business risks early-warning system to clearing and non-clearing members of Taiwan Futures Exchange,” conducted by Shen Da Bai, professor at Accountant, Suzhou University. The project took 13 main warning indicators and 6 valuation groups simultaneously from beginning of May 2006 till the end of October 2006 as the first phase to conduct the research. The research weighted early-warning system indicators and their scoring as sampling, then to analyze to further discern the importance of the risk warning messages. Since those indicators are too sensitive in the evaluation process, the system employs 6 evaluation groups to adjust the indicator’s sensitivity for enhancing the risk analysis and improving the indicator’s efficiency. The project was then taking 6 valuation groups and 19 early-warning indicators from January to June in 2007 as the second phase. The system weights 19 main indicators for final grades and analyzes 6 valuation groups to further discern the importance of the risk warning messages. The system also employs 6 evaluation groups to adjust and reduce the sensitivity of those 19 main indicators for enhancing the risk analysis and improving the indicator’s efficiency. In conclusion, the work of business risk-warning can not just count on only one aspect. All the surveillance governing-systems have to complement with each other because there is none single surveillance governing-system could take account of every aspect. At the end of all, the auditor, or the executor, is more important than any warning system. none 林丙輝 2008 學位論文 ; thesis 111 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣科技大學 === 財務金融研究所 === 96 === This thesis is based on the recommendations of research report entitled ”The adjustments of business risks early-warning system to clearing and non-clearing members of Taiwan Futures Exchange,” conducted by Shen Da Bai, professor at Accountant, Suzhou University. The project took 13 main warning indicators and 6 valuation groups simultaneously from beginning of May 2006 till the end of October 2006 as the first phase to conduct the research. The research weighted early-warning system indicators and their scoring as sampling, then to analyze to further discern the importance of the risk warning messages. Since those indicators are too sensitive in the evaluation process, the system employs 6 evaluation groups to adjust the indicator’s sensitivity for enhancing the risk analysis and improving the indicator’s efficiency. The project was then taking 6 valuation groups and 19 early-warning indicators from January to June in 2007 as the second phase. The system weights 19 main indicators for final grades and analyzes 6 valuation groups to further discern the importance of the risk warning messages. The system also employs 6 evaluation groups to adjust and reduce the sensitivity of those 19 main indicators for enhancing the risk analysis and improving the indicator’s efficiency. In conclusion, the work of business risk-warning can not just count on only one aspect. All the surveillance governing-systems have to complement with each other because there is none single surveillance governing-system could take account of every aspect. At the end of all, the auditor, or the executor, is more important than any warning system.
author2 none
author_facet none
Chun-ching Huang
黃春景
author Chun-ching Huang
黃春景
spellingShingle Chun-ching Huang
黃春景
Implementing Early -Warning System for Risk Management on Futures Commission Merchants: Case Studies in Taiwan.
author_sort Chun-ching Huang
title Implementing Early -Warning System for Risk Management on Futures Commission Merchants: Case Studies in Taiwan.
title_short Implementing Early -Warning System for Risk Management on Futures Commission Merchants: Case Studies in Taiwan.
title_full Implementing Early -Warning System for Risk Management on Futures Commission Merchants: Case Studies in Taiwan.
title_fullStr Implementing Early -Warning System for Risk Management on Futures Commission Merchants: Case Studies in Taiwan.
title_full_unstemmed Implementing Early -Warning System for Risk Management on Futures Commission Merchants: Case Studies in Taiwan.
title_sort implementing early -warning system for risk management on futures commission merchants: case studies in taiwan.
publishDate 2008
url http://ndltd.ncl.edu.tw/handle/61289660802894214992
work_keys_str_mv AT chunchinghuang implementingearlywarningsystemforriskmanagementonfuturescommissionmerchantscasestudiesintaiwan
AT huángchūnjǐng implementingearlywarningsystemforriskmanagementonfuturescommissionmerchantscasestudiesintaiwan
AT chunchinghuang qīhuòshāngjīngyíngfēngxiǎnyùjǐngxìtǒngcǎiyòng6dàqúnzǔkòngguǎnzhíxíngchéngxiàoshízhèngjíànlìtàntǎo
AT huángchūnjǐng qīhuòshāngjīngyíngfēngxiǎnyùjǐngxìtǒngcǎiyòng6dàqúnzǔkòngguǎnzhíxíngchéngxiàoshízhèngjíànlìtàntǎo
_version_ 1718271246240579584