The Measurement of Standard Time for Consecutively Multi-Stage Production System - A Case Study of SMT Process
碩士 === 國立屏東科技大學 === 工業管理系所 === 96 === This research is focus on the working hour correlation with different station which based on consecutively multi-stage production system. This kind of production type has applied in manufacturing industry for a long while and it is easy to result in the alterabl...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/73919103093180902163 |
id |
ndltd-TW-096NPUS5041002 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-096NPUS50410022016-12-22T04:11:55Z http://ndltd.ncl.edu.tw/handle/73919103093180902163 The Measurement of Standard Time for Consecutively Multi-Stage Production System - A Case Study of SMT Process 多站連續生產型態之標準工時量測-以SMT製程為例 Huang, Bang Shiun 黃邦賢 碩士 國立屏東科技大學 工業管理系所 96 This research is focus on the working hour correlation with different station which based on consecutively multi-stage production system. This kind of production type has applied in manufacturing industry for a long while and it is easy to result in the alterable bottleneck-shifting then disturbance production planning. Therefore, this thesis attempts to raise a forecast model of standard production time which applies to the evaluation of production planning and on-site productively. In this case, we applied the method of regression analysis to determine the interruption factors of working hour between each stage; the MAD and RMSE indicators also applied for the standard working hour evaluation. The obtained results can be adopted as references for the measurement of standard time. Ho, Cheng-pin 何正斌 2008 學位論文 ; thesis 65 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立屏東科技大學 === 工業管理系所 === 96 === This research is focus on the working hour correlation with different station which based on consecutively multi-stage production system. This kind of production type has applied in manufacturing industry for a long while and it is easy to result in the alterable bottleneck-shifting then disturbance production planning. Therefore, this thesis attempts to raise a forecast model of standard production time which applies to the evaluation of production planning and on-site productively. In this case, we applied the method of regression analysis to determine the interruption factors of working hour between each stage; the MAD and RMSE indicators also applied for the standard working hour evaluation. The obtained results can be adopted as references for the measurement of standard time.
|
author2 |
Ho, Cheng-pin |
author_facet |
Ho, Cheng-pin Huang, Bang Shiun 黃邦賢 |
author |
Huang, Bang Shiun 黃邦賢 |
spellingShingle |
Huang, Bang Shiun 黃邦賢 The Measurement of Standard Time for Consecutively Multi-Stage Production System - A Case Study of SMT Process |
author_sort |
Huang, Bang Shiun |
title |
The Measurement of Standard Time for Consecutively Multi-Stage Production System - A Case Study of SMT Process |
title_short |
The Measurement of Standard Time for Consecutively Multi-Stage Production System - A Case Study of SMT Process |
title_full |
The Measurement of Standard Time for Consecutively Multi-Stage Production System - A Case Study of SMT Process |
title_fullStr |
The Measurement of Standard Time for Consecutively Multi-Stage Production System - A Case Study of SMT Process |
title_full_unstemmed |
The Measurement of Standard Time for Consecutively Multi-Stage Production System - A Case Study of SMT Process |
title_sort |
measurement of standard time for consecutively multi-stage production system - a case study of smt process |
publishDate |
2008 |
url |
http://ndltd.ncl.edu.tw/handle/73919103093180902163 |
work_keys_str_mv |
AT huangbangshiun themeasurementofstandardtimeforconsecutivelymultistageproductionsystemacasestudyofsmtprocess AT huángbāngxián themeasurementofstandardtimeforconsecutivelymultistageproductionsystemacasestudyofsmtprocess AT huangbangshiun duōzhànliánxùshēngchǎnxíngtàizhībiāozhǔngōngshíliàngcèyǐsmtzhìchéngwèilì AT huángbāngxián duōzhànliánxùshēngchǎnxíngtàizhībiāozhǔngōngshíliàngcèyǐsmtzhìchéngwèilì AT huangbangshiun measurementofstandardtimeforconsecutivelymultistageproductionsystemacasestudyofsmtprocess AT huángbāngxián measurementofstandardtimeforconsecutivelymultistageproductionsystemacasestudyofsmtprocess |
_version_ |
1718402557240410112 |