An optimal capacity allocation plan under a coupled MTS-MTO production environment
碩士 === 國立高雄第一科技大學 === 運籌管理所 === 96 === In a coupled MTS-MTO production environment, postponement of semi-finished parts can be executed to better utilize those precious but unused production capacities. We consider an optimal capacity allocation plan among MTO, MTS and postponement with data from a...
Main Authors: | Chung-Sheng Wu, 吳忠勝 |
---|---|
Other Authors: | Kune-muh Tsai |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/tv67g7 |
Similar Items
-
The Most Suitable Allocate MTO/MTS Output under Product Price Uncertainty
by: Li-wei Tsai, et al.
Published: (2008) -
An optimization approach to aggregate production planning with combined MTS-MTO production strategy
by: Jose Luis Garrido Vila Cha
Published: (2021) -
Optimal MTS and MTO Hybrid Production System for a Single Product Under the Cap-And-Trade Environment
by: Shouyao Xiong, et al.
Published: (2020-03-01) -
Production mode combinations of MTS/MTO under production cost variation
by: Ping-Wen Chen, et al.
Published: (2011) -
Demand Prediction Strategy In A Hybrid MTO/MTS Production Environment
by: Shih-FengLin, et al.
Published: (2015)