Study of S-Curve Model for Bridge Construction Projects
碩士 === 國立高雄第一科技大學 === 營建工程所 === 96 === Progress control and cost control are the two main focuses of performance management for construction projects; hence many contractors often purposely adjust their planned progress for initial and middle phases of a project to lower percentages so as to avoid b...
Main Authors: | Tung-Kuang Huang, 黃東光 |
---|---|
Other Authors: | Li-Chung Chao |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/78895703410359211157 |
Similar Items
-
A Study of Customer Satisfaction after Liner Shipping Industry merger - CSAV Group in Taiwan market as a Case Study
by: Tung-Kuang Chen, et al.
Published: (2004) -
S-curve modelling in early phases of construction projects
by: Nives Ostojić-Škomrlj, et al.
Published: (2012-09-01) -
A simplified method of constructing fragility curves for bridges
by: HSIN-KAI WANG, et al.
Published: (2008) -
Construction Simulation of Curved Steel I-Girder Bridges
by: Chang, Ching-Jen
Published: (2006) -
Study of Aerodynamic Stability of Curved Cable-Stayed Bridges
by: Ming-Hui Huang, et al.
Published: (2005)