A Study on the Disputes of Kaohsiung MRT Design-Build Projects
碩士 === 國立高雄第一科技大學 === 營建工程所 === 96 === In recent years, Due to the increasing use of the design & build (D/B) delivery method the numer of disputes arising thereof also increased. However, only few studies have made on the disputes of the design & build contracts. This research aims to fil...
Main Authors: | Chihg-Hsiung Lee, 李慶雄 |
---|---|
Other Authors: | Lo Wei |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/41757533823540333711 |
Similar Items
-
Study of Kaohsiung MRT
by: Tse-Chuan Lee, et al.
Published: (2018) -
The Research of Disputes on Construction and Final Acceptance in MRT Project
by: Tsay-Ming, et al.
Published: (2015) -
Lessons Learned from the Design Phase of Kaohsiung MRT BOT Project
by: Yaw-Ming Dong, et al.
Published: (2002) -
The study for strategies of BOT development in Taiwan-Kaohsiung MRT Project
by: Chung-Yung Chang, et al.
Published: (2004) -
Formosa Kaohsiung MRT station project of public facilities
by: Wang, Li-Jun, et al.
Published: (2011)