A research of blend spine-configuration with direct transport track facility layout problem.

碩士 === 國立中央大學 === 工業管理研究所 === 96 === In semiconductor manufacturing, getting high performance in low cost such as reducing work in process, delivery distance or delivery time, cycle time and increase yield is the most important purpose. How to get the high performance is the question. The facility l...

Full description

Bibliographic Details
Main Authors: Yu-En Pan, 潘羽恩
Other Authors: Ying-Chin Ho
Format: Others
Language:zh-TW
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/68638548661242354026
id ndltd-TW-096NCU05041049
record_format oai_dc
spelling ndltd-TW-096NCU050410492016-05-11T04:16:23Z http://ndltd.ncl.edu.tw/handle/68638548661242354026 A research of blend spine-configuration with direct transport track facility layout problem. 結合直通軌道之脊椎式晶圓廠規劃 Yu-En Pan 潘羽恩 碩士 國立中央大學 工業管理研究所 96 In semiconductor manufacturing, getting high performance in low cost such as reducing work in process, delivery distance or delivery time, cycle time and increase yield is the most important purpose. How to get the high performance is the question. The facility layout design and AMHS, doing the best in finite space, are the questions to achieve a successful 300mm fab. The purpose on this paper is that the products to process of the Bay must pass through the Stocker, it is almost cost a lot of time. If we can set up a Direct Transport Track within Bays to make the products pass through without Stocker. We trust that set up a Direct Transport Track can reduce transportation distance and save a lot of time. For this reason to plan the best Direct Transport Track, we must consider the IntraBay and InterBay layout. The paper focuses on spine configuration in fab layout, and in different of other papers, it considers the IntraBay and InterBay defined. To achieve a short transportation distance both in IntraBay and InterBay, we using heuristic algorithm and mathematical model. First, we defined the machine layout of Bay by FLA method, Simulated Annealing, and Extra cost. Second, we defined the Bay layout by Visual C++ and mathematical model using CPLEX 7.0. Final, we find the Direct Transport Track also by mathematical model. Based on this analysis, we expect that the facility layout will reduce transportation distance of wafer lots, and increase equipment utility. Ying-Chin Ho 何應欽 2008 學位論文 ; thesis 115 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中央大學 === 工業管理研究所 === 96 === In semiconductor manufacturing, getting high performance in low cost such as reducing work in process, delivery distance or delivery time, cycle time and increase yield is the most important purpose. How to get the high performance is the question. The facility layout design and AMHS, doing the best in finite space, are the questions to achieve a successful 300mm fab. The purpose on this paper is that the products to process of the Bay must pass through the Stocker, it is almost cost a lot of time. If we can set up a Direct Transport Track within Bays to make the products pass through without Stocker. We trust that set up a Direct Transport Track can reduce transportation distance and save a lot of time. For this reason to plan the best Direct Transport Track, we must consider the IntraBay and InterBay layout. The paper focuses on spine configuration in fab layout, and in different of other papers, it considers the IntraBay and InterBay defined. To achieve a short transportation distance both in IntraBay and InterBay, we using heuristic algorithm and mathematical model. First, we defined the machine layout of Bay by FLA method, Simulated Annealing, and Extra cost. Second, we defined the Bay layout by Visual C++ and mathematical model using CPLEX 7.0. Final, we find the Direct Transport Track also by mathematical model. Based on this analysis, we expect that the facility layout will reduce transportation distance of wafer lots, and increase equipment utility.
author2 Ying-Chin Ho
author_facet Ying-Chin Ho
Yu-En Pan
潘羽恩
author Yu-En Pan
潘羽恩
spellingShingle Yu-En Pan
潘羽恩
A research of blend spine-configuration with direct transport track facility layout problem.
author_sort Yu-En Pan
title A research of blend spine-configuration with direct transport track facility layout problem.
title_short A research of blend spine-configuration with direct transport track facility layout problem.
title_full A research of blend spine-configuration with direct transport track facility layout problem.
title_fullStr A research of blend spine-configuration with direct transport track facility layout problem.
title_full_unstemmed A research of blend spine-configuration with direct transport track facility layout problem.
title_sort research of blend spine-configuration with direct transport track facility layout problem.
publishDate 2008
url http://ndltd.ncl.edu.tw/handle/68638548661242354026
work_keys_str_mv AT yuenpan aresearchofblendspineconfigurationwithdirecttransporttrackfacilitylayoutproblem
AT pānyǔēn aresearchofblendspineconfigurationwithdirecttransporttrackfacilitylayoutproblem
AT yuenpan jiéhézhítōngguǐdàozhījíchuíshìjīngyuánchǎngguīhuà
AT pānyǔēn jiéhézhítōngguǐdàozhījíchuíshìjīngyuánchǎngguīhuà
AT yuenpan researchofblendspineconfigurationwithdirecttransporttrackfacilitylayoutproblem
AT pānyǔēn researchofblendspineconfigurationwithdirecttransporttrackfacilitylayoutproblem
_version_ 1718264715173429248