On the study of manpower assignment for flood prevention in Typhoon season.
碩士 === 國立中央大學 === 土木工程學系碩士在職專班 === 96 === Abstract Typhoon flood prevention work often requires a great deal of manpower and material support to complete the task, but the manpower and budget of competent authorities are often subject to considerable restrictions in practice.So, how can the limited...
Main Authors: | Kuei-ching Chen, 陳貴青 |
---|---|
Other Authors: | Shangyao Yan |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/huy8r7 |
Similar Items
-
An Optimization Model For Park Guard Manpower Assignment
by: Ing-fa Chen, et al.
Published: (2011) -
Effect of Data Reliability of The QPESUMS and Flood Forecasting During Typhoon Seasons
by: Jhih-Cyuan Shen, et al.
Published: (2018) -
AN OPTIMIZATION MODEL FOR MANPOWER ASSIGNMENT TO OFFICIAL AUDITING IN SANITARY AFFAIRS
by: Ching-Chung Yeh, et al.
Published: (2008) -
An Optimization Model For Park Maintenance Manpower Assignment
by: Yu-chun Hsu, et al.
Published: (2008) -
A Study on Fire Fighting Manpower Contracting Out Feasibility in Domestic Airports
by: Yu-kuei Chen, et al.
Published: (2006)